BR100 Increased By (0.61%)
BR30 Increased By (0.79%)
KSE100 Increased By (0.64%)
KSE30 Increased By (0.67%)
AGHA 6.53 Increased By ▲ 0.15 (2.35%)
BECO 4.35 No Change ▼ 0.00 (0%)
BML 62.25 Decreased By ▼ -0.30 (-0.48%)
BOP 31.52 Increased By ▲ 0.13 (0.41%)
CNERGY 11.85 Increased By ▲ 0.12 (1.02%)
CSIL 5.98 Increased By ▲ 0.07 (1.18%)
FCCL 62.00 Increased By ▲ 0.29 (0.47%)
FFL 14.87 Increased By ▲ 0.08 (0.54%)
FNEL 1.29 Increased By ▲ 0.05 (4.03%)
KEL 6.35 Increased By ▲ 0.03 (0.47%)
KOSM 5.91 Increased By ▲ 0.01 (0.17%)
LOTCHEM 24.88 Increased By ▲ 0.19 (0.77%)
MLCF 105.09 Increased By ▲ 1.16 (1.12%)
NBP 174.36 Increased By ▲ 1.04 (0.6%)
NCPL 52.20 Increased By ▲ 0.37 (0.71%)
NPL 54.50 Increased By ▲ 0.47 (0.87%)
OGDC 319.00 Increased By ▲ 3.13 (0.99%)
PACE 9.31 Increased By ▲ 0.05 (0.54%)
PAEL 36.00 Increased By ▲ 0.42 (1.18%)
PIBTL 13.80 Increased By ▲ 0.14 (1.02%)
PPL 228.35 Increased By ▲ 2.28 (1.01%)
PRL 81.00 Increased By ▲ 0.72 (0.9%)
PTC 47.24 Increased By ▲ 0.60 (1.29%)
SSGC 24.08 Increased By ▲ 0.26 (1.09%)
TBL 9.31 Increased By ▲ 0.07 (0.76%)
TELE 7.59 Increased By ▲ 0.04 (0.53%)
TPL 25.19 Increased By ▲ 0.65 (2.65%)
TPLP 13.05 Increased By ▲ 0.06 (0.46%)
TREET 26.10 Increased By ▲ 0.12 (0.46%)
TRG 53.79 Increased By ▲ 0.46 (0.86%)

KARACHI Pakistan Railways management has advised the passengers to confirm the latest train timings before departure to avoid any inconvenience.

In recent days, some trains were delayed due to engineering constraints and signalling issues. Keeping this in mind, the railway administration has decided to temporarily suspend the implementation of the current winter timetable.

The previous timetable (April 15, 2025 to October 14, 2025) will be re-implemented from tomorrow, November 10, 2025.

According to the railway spokesperson, this measure is taken for short period. As soon as the engineering and signalling situation improves, trains movement will be restored as usual.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.