BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

Engro Powergen Qadirpur Limited (EPQL), a subsidiary of Engro Energy Limited, announced that it has received a formal no objection certificate (NOC) from the Private Power and Infrastructure Board (PPIB) for the supplemental agreement to its Power Purchase Agreement (PPA) with the Central Power Purchasing Agency (Guarantee) Limited (CPPA-G).

“The supplemental agreement enables inclusion of low BTU gas (8~13 mmscfd) from the Badar gas field, supplied by Petroleum Exploration Limited (PEL Gas), as an additional fuel source for the company’s power plant,” EPQL said in a notice to the Pakistan Stock Exchange (PSX) on Friday.

Engro Powergen Qadirpur Limited operates a dual-fuel power generation facility with a gross capacity of 226.53MW (net 217.3 MW).

The plant is a combined cycle plant, with a 1+1+1 configuration including one gas turbine, one heat recovery system generator (HRSG), and one steam turbine. The plant, located in Ghotki, Sindh, primarily uses permeate gas from the Qadirpur gas field, while High-Speed Diesel (HSD) serves as the secondary fuel.

Last year in August, the company signed a gas supply deal with PEL, but it could only start using the gas once the agreement was fully approved by regulators.

Comments

Comments are closed for this article.