BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

ISLAMABAD: Chashma Nuclear Power Plant Unit-1 (C-1) has achieved the milestone of continuous operation for 400 days for the first time in the history of Pakistan.

Earlier, Chashma Nuclear Power Plant (NPP) Unit-2 (C-2) and C-4 had made the record continuous run for 365 days.

Pakistan Atomic Energy Commission (PAEC) is currently operating six nuclear power plants in the country, providing 3530 MWs of electricity to the national grid. Four of these plants are at Chashma, near Mianwali whereas two named K-2 and K-3 are sited near Karachi.

The achievement of C-1 NPP is due to the acumen and hard work of PAEC teams of scientists, engineers and technicians. Currently, Chashma Nuclear Power Plants (C-1 to C-4) are running with high capacity and availability factors. Member Power, PAEC, has congratulated his team at Chashma Nuclear Power Generation Station (CNPGS) for the achievement, ensuring all safety parameters.

The stability of the national grid maintained by National Transmission and Despatch Company (NTDC) has also played a pivotal role in continuous operation of the NPP for which the company deserves felicitations.

PAEC is striving to achieve the United Nation’s Sustainable Development Goals (SDGs) especially SDG-7 (Ensuring access to affordable, reliable, sustainable and modern energy for all).

PAEC has been maintaining an enviable operational experience since Karachi Nuclear Power Plant (KANUPP) was connected to the national grid in 1972?

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.