BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

LAHORE: Punjab government has approved seven development schemes worth more than Rs 9 billion here on Wednesday.

In this regard a meeting of Provincial Development Working Party (PDWP) FY 2024-25 held here in the Planning and Development Complex.

The meeting was presided by the Chairman P&D Board Barrister Nabeel Ahmad Awan in which seven development schemes of roads, and P&S HC sectors were approved with an estimated cost of Rs 8974.993 million.

According to details, rehabilitation of Shujabad Jalalpur Pirwala 48.50 Km long District Multan at the cost of Rs 2700.697 million was approved.

The second development scheme of dualization of Metalled Road from Thalli Chowk Rahim Yar Khan to Iqbalabad (N-5) District RY Khan at the cost of Rs 1025.247 million and rehabilitation of road from Kasur to Raiwind, length 25.48 Km in district kasur at the cost of Rs 2095.294 million were also approved.

The rehabilitation of metalled road from Shoria Gilania Chowk (N-55) to Samina Sadat length 8.80 km at the cost of Rs 418.345 million and the construction of flyover at Jhal road railway crossing to Sahiwal City at Rs 914 million were approved.

The last but not least the construction of Dual Carriageway Road from M-3 Motorway Samundri Interchange to Samundri City District Faisalabad at the cost of Rs 1767.119 million and the Infection Control Programme Phase (II) at the cost of Rs 473.636 million were approved.

Secretary P&D Board Dr Asif Tufail, Chief Economist Dr Nasir Iqbal Malik, Members P&D Board, Head of relevant departments and other senior representatives of the relevant provincial departments attended the meeting.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.