AIRLINK 74.25 Decreased By ▼ -0.35 (-0.47%)
BOP 5.05 Decreased By ▼ -0.09 (-1.75%)
CNERGY 4.42 Decreased By ▼ -0.08 (-1.78%)
DFML 35.84 Increased By ▲ 2.84 (8.61%)
DGKC 88.00 Decreased By ▼ -0.90 (-1.01%)
FCCL 22.20 Decreased By ▼ -0.35 (-1.55%)
FFBL 32.72 Increased By ▲ 0.02 (0.06%)
FFL 9.79 Decreased By ▼ -0.05 (-0.51%)
GGL 10.80 Decreased By ▼ -0.08 (-0.74%)
HBL 115.90 Increased By ▲ 0.59 (0.51%)
HUBC 135.84 Decreased By ▼ -0.79 (-0.58%)
HUMNL 9.84 Decreased By ▼ -0.13 (-1.3%)
KEL 4.61 Decreased By ▼ -0.02 (-0.43%)
KOSM 4.66 Decreased By ▼ -0.04 (-0.85%)
MLCF 39.88 Increased By ▲ 0.18 (0.45%)
OGDC 137.90 Decreased By ▼ -1.06 (-0.76%)
PAEL 26.43 Decreased By ▼ -0.46 (-1.71%)
PIAA 26.28 Increased By ▲ 1.13 (4.49%)
PIBTL 6.76 Decreased By ▼ -0.08 (-1.17%)
PPL 122.90 Increased By ▲ 0.16 (0.13%)
PRL 26.69 Decreased By ▼ -0.32 (-1.18%)
PTC 14.00 No Change ▼ 0.00 (0%)
SEARL 58.70 Decreased By ▼ -0.77 (-1.29%)
SNGP 70.40 Decreased By ▼ -0.75 (-1.05%)
SSGC 10.36 Decreased By ▼ -0.08 (-0.77%)
TELE 8.56 Decreased By ▼ -0.09 (-1.04%)
TPLP 11.38 Decreased By ▼ -0.13 (-1.13%)
TRG 64.23 Decreased By ▼ -0.90 (-1.38%)
UNITY 26.05 Increased By ▲ 0.25 (0.97%)
WTL 1.38 Decreased By ▼ -0.03 (-2.13%)
BR100 7,838 Increased By 19.2 (0.24%)
BR30 25,460 Decreased By -117.2 (-0.46%)
KSE100 74,931 Increased By 266.7 (0.36%)
KSE30 24,146 Increased By 74.2 (0.31%)

LAHORE: Electricity generation from Neelum Jhelum Hydel Power Station has been restricted to 530 MW due to decrease in head race tunnel pressure on April 03, 2024.

This precautionary measure has been taken to observe the behaviour of pressure fluctuation. Generation from the power station will be increased gradually after analysis and deliberations with the project consultants.

Neelum Jhelum Hydel Power Station remained on full generation of 969 MW from March 28, 2024.

It is important to note that all possible maintenance has been carried out during the observation. This maintenance includes cleaning of trash racks installed at the intake gates in the reservoir, flushing of all three de-sanders, flushing of pressure gauge installed at the power house and inspection of the spiral cases of the generating units.

Copyright Business Recorder, 2024

Comments

Comments are closed.