BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.35 Increased By ▲ 0.03 (0.47%)
BECO 4.39 Increased By ▲ 0.12 (2.81%)
BML 62.50 Increased By ▲ 0.05 (0.08%)
BOP 31.47 Increased By ▲ 0.24 (0.77%)
CNERGY 11.70 Increased By ▲ 0.11 (0.95%)
CSIL 5.92 Increased By ▲ 0.20 (3.5%)
FCCL 61.60 Increased By ▲ 0.06 (0.1%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.23 No Change ▼ 0.00 (0%)
KEL 6.33 Increased By ▲ 0.07 (1.12%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.79 Increased By ▲ 0.11 (0.45%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.05 Decreased By ▼ -2.23 (-1.27%)
NCPL 51.85 Decreased By ▼ -0.92 (-1.74%)
NPL 54.19 Increased By ▲ 0.07 (0.13%)
OGDC 315.50 Increased By ▲ 2.11 (0.67%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.51 Decreased By ▼ -0.29 (-0.81%)
PIBTL 13.65 Increased By ▲ 0.18 (1.34%)
PPL 226.60 Increased By ▲ 4.79 (2.16%)
PRL 80.30 Increased By ▲ 1.22 (1.54%)
PTC 46.89 Increased By ▲ 0.04 (0.09%)
SSGC 23.90 Increased By ▲ 0.03 (0.13%)
TBL 9.30 Decreased By ▼ -0.01 (-0.11%)
TELE 7.65 Increased By ▲ 0.26 (3.52%)
TPL 24.51 Decreased By ▼ -0.60 (-2.39%)
TPLP 13.04 Increased By ▲ 0.53 (4.24%)
TREET 26.05 Decreased By ▼ -0.20 (-0.76%)
TRG 53.38 Decreased By ▼ -0.06 (-0.11%)

LAHORE: The Pakistan Water and Power Development Authority (Wapda) signed an agreement worth Rs 776.3 million to a joint venture for consultancy services for Stage-II of Kurram Tangi Dam Project.

The joint venture is comprised of four firms – one from Turkey and three from Pakistan – with DOLSAR as the lead firm. The contract comprises of consultancy services for detailed engineering design, preparation of updated PC-I, PC-I for land acquisition and resettlement plan, and tender documents of the project.

Duration of consultancy contract is 22 months. The Asian Development Bank is providing financial assistance for the consultancy services of the Stage-II.

Land acquisition completed for Dasu Dam: WAPDA chief

The contract-signing ceremony was held at Wapda House. Chief Engineer and Project Director Kurram Tangi Dam Muhammad Shafiq Bhettani and International Projects Coordinator of DOLSAR Cem Aker signed the contract on behalf of Wapda and the joint venture respectively.

The ceremony was also attended by Member (Power) Wapda Jamil Akhtar, Advisor (Projects) Wapda, GM (Projects) North, GM (Coordination & Monitoring) Water, GM (Central Contract Cell), GM (Central Design Office) and GM (Hydro Resource Management).

Stage-II of Kurram Tangi Dam Project is proposed to be constructed on Kurram River in North Waziristan District of Khyber Pakhtunkhwa, about 14 Km upstream of Kurram Garhi Headworks and 32 Km North of Bannu City.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.

Builder Sep 02, 2023 11:28am
We'll first pay for construction of the dam through electricity bills. We will then pay for electricity produced by this project....through electricity bills and so on. Power division to Nepra to Wanda, all are geniuses!
0