BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

KARACHI: Mayor Karachi Barrister Murtaza Wahab has said that the development work on roads and storm water drains is going on in various areas under a ‘Karachi Mega Project’.

On visiting Allama Rashid Turabi Road, Shahrah Humayun, Shahrah Noor Jahan and Shadman Nullah, the Mayor said the projects which are urgently needed in the megacity have been prioritized keeping the convenience of the citizens.

Deputy Mayor Karachi Salman Abdullah Murad was also with him. Project Director on this occasion briefed Mayor Karachi about details of the projects included in the Karachi mega project.

Murtaza Wahab said that Allama Rashid Turabi Road is three and a half kilometres long. Here first the drain work is being done, after that the road will be carpeted.

Later, the Mayor visited Shahrah Humayun, where after the completion of the construction of the storm water drain, the 20-km long road is now being carpeted.

Wahab inspected the construction of the road from Asghar Ali Shah Chowk to Qalandria Chowk, where the work of drain is in progress.

The Mayor inspected the development work on the Shadman Nullah.

He issued directives to officers that all the work should be completed at a fast speed for the convenience of the citizens.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.