AIRLINK 200.75 Increased By ▲ 7.19 (3.71%)
BOP 10.21 Increased By ▲ 0.26 (2.61%)
CNERGY 7.71 Decreased By ▼ -0.22 (-2.77%)
FCCL 40.06 Decreased By ▼ -0.59 (-1.45%)
FFL 16.81 Decreased By ▼ -0.05 (-0.3%)
FLYNG 26.65 Decreased By ▼ -1.10 (-3.96%)
HUBC 132.60 Increased By ▲ 0.02 (0.02%)
HUMNL 13.92 Increased By ▲ 0.03 (0.22%)
KEL 4.65 Increased By ▲ 0.05 (1.09%)
KOSM 6.59 Decreased By ▼ -0.03 (-0.45%)
MLCF 46.74 Decreased By ▼ -0.86 (-1.81%)
OGDC 212.43 Decreased By ▼ -1.48 (-0.69%)
PACE 6.90 Decreased By ▼ -0.03 (-0.43%)
PAEL 41.28 Increased By ▲ 0.04 (0.1%)
PIAHCLA 17.00 Decreased By ▼ -0.15 (-0.87%)
PIBTL 8.11 Decreased By ▼ -0.30 (-3.57%)
POWER 9.42 Decreased By ▼ -0.22 (-2.28%)
PPL 181.46 Decreased By ▼ -0.89 (-0.49%)
PRL 41.78 Decreased By ▼ -0.18 (-0.43%)
PTC 24.70 Decreased By ▼ -0.20 (-0.8%)
SEARL 111.84 Increased By ▲ 5.00 (4.68%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 43.92 Increased By ▲ 3.82 (9.53%)
SYM 18.98 Increased By ▲ 1.51 (8.64%)
TELE 8.87 Increased By ▲ 0.03 (0.34%)
TPLP 12.92 Increased By ▲ 0.17 (1.33%)
TRG 67.47 Increased By ▲ 0.52 (0.78%)
WAVESAPP 11.42 Increased By ▲ 0.09 (0.79%)
WTL 1.79 No Change ▼ 0.00 (0%)
YOUW 3.99 Decreased By ▼ -0.08 (-1.97%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

LAHORE: Managing Director NTDC, Engr. Dr. Rana Abdul Jabbar Khan has said that successful installation and energization of three auto transformers at different grid stations is a significant achievement of NTDC teams in addressing the increasing load demand of consumers of IESCO, FESCO, and MEPCO.

He said the 450 MVA, 500/220kV Auto Transformer at the Rawat grid station, the newly augmented 250 MVA 220/132kV Auto Transformer T-3 at the Samundri Road grid station and the replacement of the damaged 220/132 kV Auto Transformer with a 160 MVA Auto Transformer at the Bahawalpur grid station will enhance the capacity of these stations, leading to a more reliable and stable power supply.

The removal of system constraints is critical for the energy sector's smooth functioning and NTDC's comprehensive plan to address this is commendable, he said and appreciated the efforts of the technical and maintenance teams for the rehabilitation and construction works of said transformers.

Copyright Business Recorder, 2023

Comments

Comments are closed.