AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

KARACHI: Pakistan People’s Party Chairman and Foreign Minister Bilawal Bhutto Zardari Thursday inaugurated the Zia Mohiuddin Flyover on Gulistan-e-Jauhar Chowrangi built by the Local Government Department to solve the traffic jam problem of the area residents.

Sindh Chief Minister Syed Murad Ali Shah, Local Government Minister Nasir Shah, Information Minister Sharjeel Memon, Social Welfare Minister Shehla Raza and others participated in the inauguration ceremony.

Local Government Minister Syed Nasir Shah while giving a briefing to Chairman PPP said that the project of flyover and underpass on Jauhar Chowrangi was started with Rs 2.14 billion.

He further said that the work on the flyover has been completed while underpass is in progress.

Work on the flyover was started in October 2022 which has been completed while the construction of the underpass was started in March 2023.

The length of the flyover is 461 meters while its width is 18.2 meters.

The length of the bridge is 226 meters. LED lights have been installed in the double arm poles on the flyover.

The Chairman directed the Local Government Minister to speed up the work on the underpass so that it can be completed as soon as possible.

Copyright Business Recorder, 2023

Comments

Comments are closed.