AIRLINK 74.00 Decreased By ▼ -0.56 (-0.75%)
BOP 5.02 Decreased By ▼ -0.04 (-0.79%)
CNERGY 4.42 Decreased By ▼ -0.04 (-0.9%)
DFML 39.20 Decreased By ▼ -0.53 (-1.33%)
DGKC 86.09 Decreased By ▼ -1.46 (-1.67%)
FCCL 21.65 Decreased By ▼ -0.28 (-1.28%)
FFBL 34.01 Decreased By ▼ -0.58 (-1.68%)
FFL 9.92 Increased By ▲ 0.17 (1.74%)
GGL 10.56 Increased By ▲ 0.07 (0.67%)
HBL 113.89 Increased By ▲ 0.10 (0.09%)
HUBC 135.84 Decreased By ▼ -0.68 (-0.5%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.84 Increased By ▲ 0.17 (3.64%)
KOSM 4.53 Decreased By ▼ -0.11 (-2.37%)
MLCF 38.27 Decreased By ▼ -0.19 (-0.49%)
OGDC 134.85 Decreased By ▼ -1.29 (-0.95%)
PAEL 26.35 Decreased By ▼ -0.26 (-0.98%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.68 Increased By ▲ 0.01 (0.15%)
PPL 123.00 Increased By ▲ 0.71 (0.58%)
PRL 26.69 Decreased By ▼ -0.28 (-1.04%)
PTC 14.33 Increased By ▲ 0.42 (3.02%)
SEARL 59.12 Decreased By ▼ -0.75 (-1.25%)
SNGP 69.50 Decreased By ▼ -0.56 (-0.8%)
SSGC 10.33 Decreased By ▼ -0.02 (-0.19%)
TELE 8.50 Decreased By ▼ -0.04 (-0.47%)
TPLP 11.23 Decreased By ▼ -0.11 (-0.97%)
TRG 64.85 Decreased By ▼ -1.15 (-1.74%)
UNITY 26.25 Decreased By ▼ -0.08 (-0.3%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,851 Increased By 26.3 (0.34%)
BR30 25,337 Decreased By -69.2 (-0.27%)
KSE100 75,207 Increased By 122.8 (0.16%)
KSE30 24,143 Increased By 49.1 (0.2%)

LAHORE: The Punjab Provincial Development Working Party approved thirteen development schemes of various sectors with an estimated cost of Rs. 36,517.44 million.

These schemes were approved in the 23rd meeting of Provincial Development Working Party (PDWP) of current fiscal year 2022-23 presided over the Chairman Planning & Development Board Abdullah Khan Sumbal.

The approved development schemes included Strengthening of Muhammad Nawaz Sharif University of Agriculture, Multan at the cost of Rs. 650 million, Rehabilitation of Road from Chunian to Habib Abad Lahore Multan Road, Length=19.95 Km, District Kasur (Revised) at the cost of Rs. 449.621 million, Widening / Improvement of Jhang Sahiwal Sargodha Road in District Sargodha at the cost of Rs. 2,180.206 million, Rehabilitation / Reconstruction of Road from Faisalabad Road to Lahore Road along with Canal Bank Length 28.47 Km in District Sargodha at the cost of Rs. 1,179.868 million, Widening / Improvement / Reconstruction of Road from Millat Road Chak No. 115/JB to 62/JB via 114/JB, 113/JB, 111/JB, 112/JB, 1/JB 46/JB, 47/JB, 50/JB Baba Bakala, 56/JB, 60/JB Length-55 Km, District Faisalabad at the cost of Rs. 911.852 million, Construction of Dual Carriageway from Sheikh Fazal to Chichawatni, Length-24.15 Km, Sahiwal at the cost of Rs. 4,555.787 million, Improvement of Energy Efficiency in WASA Systems at the cost of Rs. 495.000 million, Feasibility Study for Solarization of Courts and District Session Courts of Punjab (PC-II) at the cost of Rs. 10.000 million, Improvement of Bus Stops, Sahiwal at the cost of Rs. 110.109 million, High Street Livable Model Road, Arra Tullah Road Livable Model Road, Pedestrian & Cycling Track, Sahiwal at the cost of Rs. 1,639.831 million, Grade Separator at Railway crossing at Shahabpur Road, Sialkot at the cost of Rs. 2,105.57 million, Signals and Junctions Improvement at Sialkot at the cost of Rs. 1,483.40 million and Construction of Parking Sheds for Solid Waste Machinery in Sahiwal and Sialkot City (2nd Revised) at the cost of Rs. 507.406 million.

Copyright Business Recorder, 2022

Comments

Comments are closed.