AIRLINK 200.75 Increased By ▲ 7.19 (3.71%)
BOP 10.21 Increased By ▲ 0.26 (2.61%)
CNERGY 7.71 Decreased By ▼ -0.22 (-2.77%)
FCCL 40.06 Decreased By ▼ -0.59 (-1.45%)
FFL 16.81 Decreased By ▼ -0.05 (-0.3%)
FLYNG 26.65 Decreased By ▼ -1.10 (-3.96%)
HUBC 132.60 Increased By ▲ 0.02 (0.02%)
HUMNL 13.92 Increased By ▲ 0.03 (0.22%)
KEL 4.65 Increased By ▲ 0.05 (1.09%)
KOSM 6.59 Decreased By ▼ -0.03 (-0.45%)
MLCF 46.74 Decreased By ▼ -0.86 (-1.81%)
OGDC 212.43 Decreased By ▼ -1.48 (-0.69%)
PACE 6.90 Decreased By ▼ -0.03 (-0.43%)
PAEL 41.28 Increased By ▲ 0.04 (0.1%)
PIAHCLA 17.00 Decreased By ▼ -0.15 (-0.87%)
PIBTL 8.11 Decreased By ▼ -0.30 (-3.57%)
POWER 9.42 Decreased By ▼ -0.22 (-2.28%)
PPL 181.46 Decreased By ▼ -0.89 (-0.49%)
PRL 41.78 Decreased By ▼ -0.18 (-0.43%)
PTC 24.70 Decreased By ▼ -0.20 (-0.8%)
SEARL 111.84 Increased By ▲ 5.00 (4.68%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 43.92 Increased By ▲ 3.82 (9.53%)
SYM 18.98 Increased By ▲ 1.51 (8.64%)
TELE 8.87 Increased By ▲ 0.03 (0.34%)
TPLP 12.92 Increased By ▲ 0.17 (1.33%)
TRG 67.47 Increased By ▲ 0.52 (0.78%)
WAVESAPP 11.42 Increased By ▲ 0.09 (0.79%)
WTL 1.79 No Change ▼ 0.00 (0%)
YOUW 3.99 Decreased By ▼ -0.08 (-1.97%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

LAHORE Water Resources Federal Minister Syed Khursheed Ahmed Shah has said that Dasu is a vital project to stabilize Pakistan`s economy by providing low-cost hydel electricity and triggering a new era of socio-economic development in the country.

The Federal Minister stated this today while visiting Dasu Hydropower Project, being constructed on River Indus, upstream of Dasu town in Upper Kohistan district of Khyber Pakhtunkhwa province. He was accompanied by WAPDA Chairman Naveed Asghar Chaudhry. WAPDA project’s management and representatives of the consultants and the contractors were also present during the visit.

Speaking on the occasion, the Federal Minister said that electricity generation from Dasu Hydropower Project will commence in 2026 and tremendously contribute to cope with increasing requirement of the country by injecting sizeable cheap and green electricity to the national grid. He expressed satisfaction over pace of progress and directed WAPDA to complete the project within stipulated timeframe.

The Federal Minister also addressed the locals during the visit. He directed WAPDA that the locals be given priority in jobs on the project. A meeting will soon be convened at Islamabad with all the stakeholders to review self-managed resettlement package to address grievances of the locals, he added.

Outgoing Wapda chief visits 4 under-construction dams

Earlier, the Federal Minister had a detailed round of the various components of the project including diversion tunnels and powerhouse complex and reviewed construction activities going on there.

WAPDA GM and PD Anwar-ul-Haq apprised the Minister that the 4320 MW- Dasu Hydropower Project is being completed in two stages. At present, WAPDA is constructing stage-I with installed generation capacity of 2160 MW and annual energy generation of 12 billion low-cost and environment-friendly electricity. The stage-II, when implemented, will also provide 9 billion units to the national grid.

On completion of the both Stages, Dasu will be the project with highest annual energy generation in Pakistan i.e. 21 billion units per annum on the average. The Minister was further apprised that Rs. 17.34 billion are being spent on CBM schemes by WAPDA for economic and social development in the project area. About 3300 jobs, including 1808 for locals, have so far been created, which will increase to 8000 jobs during peak construction period of the project.

Copyright Business Recorder, 2022

Comments

Comments are closed.