BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
By

ISLAMABAD: Water and Power Development Authority (WAPDA) has expedited construction work on 12 small and medium dams aimed at enhancing a clean energy generation, water availability and climate resilience across the country.

As per details given by the official sources, the dams were dual purpose projects as these were designed to store rain and floodwater along with hydropower generation in all the federating units of the country.

He added that the small and medium dam projects initiated in Balochistan included Winder Dam project that would produce 0.3 megawatts (MW) energy and water storage capacity of 0.036 Million acre-foot (MAF), Naulong Dam to produce 4.4 MW power and store 0.20 MAF water, Hingol Dam to generate 1 MW electricity and 1.41 MAF water storage, Garuk Dam to have 0.3 MW power production capacity and 0.05 MAF water storage and Pelar Dam to produce 0.3 MW energy and would conserve 0.099 MAF water.

In Sindh, the Nai Gaj Dam would produce 4.2 MW electricity and store 0.30 MAF water, whereas the Darawat Dam was expected to produce 0.45 MW energy and store 0.12 MAF water after completion.

The WAPDA has also started work on different small and medium dams in Khyber PukhtonKhawa including the Kurram Tangi Dam of 83.4 MW hydropower potential and 1.2 MAF water storage capacity, Tank Zam Dam having 25.5 MW power generation and 0.345 MAF water storage capacity and Daraban Zam Dam would produce 0.75 MW energy and 0.069 MAF water storage capacity.

The WAPDA official further said the Authority had started construction work on different small dams in Punjab including Ghabir Dam having 0.15 MW power production capacity and 0.066 MAF water storage, and Papin Dam of 0.3 MW power and 0.089 MAF water storage capacity hydropower projects that were at various stages of development.

He informed that keeping in view the energy demands, project completion pace and availability of funds the Authority has decided to ensure swift culmination of construction and development work on the projects as it would not only help address water and energy issues rather would generate jobs for the local communities and start tourism and business opportunities.

Comments

Comments are closed for this article.