BR100 Increased By (0.9%)
BR30 Increased By (0.99%)
KSE100 Increased By (0.85%)
KSE30 Increased By (0.93%)
AGHA 6.47 Increased By ▲ 0.09 (1.41%)
BECO 4.37 Increased By ▲ 0.02 (0.46%)
BML 62.50 Decreased By ▼ -0.05 (-0.08%)
BOP 31.52 Increased By ▲ 0.13 (0.41%)
CNERGY 11.78 Increased By ▲ 0.05 (0.43%)
CSIL 5.85 Decreased By ▼ -0.06 (-1.02%)
FCCL 61.82 Increased By ▲ 0.11 (0.18%)
FFL 15.02 Increased By ▲ 0.23 (1.56%)
FNEL 1.30 Increased By ▲ 0.06 (4.84%)
KEL 6.33 Increased By ▲ 0.01 (0.16%)
KOSM 5.82 Decreased By ▼ -0.08 (-1.36%)
LOTCHEM 24.90 Increased By ▲ 0.21 (0.85%)
MLCF 105.86 Increased By ▲ 1.93 (1.86%)
NBP 174.77 Increased By ▲ 1.45 (0.84%)
NCPL 52.11 Increased By ▲ 0.28 (0.54%)
NPL 54.78 Increased By ▲ 0.75 (1.39%)
OGDC 318.99 Increased By ▲ 3.12 (0.99%)
PACE 9.32 Increased By ▲ 0.06 (0.65%)
PAEL 35.81 Increased By ▲ 0.23 (0.65%)
PIBTL 14.24 Increased By ▲ 0.58 (4.25%)
PPL 229.10 Increased By ▲ 3.03 (1.34%)
PRL 81.50 Increased By ▲ 1.22 (1.52%)
PTC 47.00 Increased By ▲ 0.36 (0.77%)
SSGC 24.01 Increased By ▲ 0.19 (0.8%)
TBL 9.26 Increased By ▲ 0.02 (0.22%)
TELE 7.67 Increased By ▲ 0.12 (1.59%)
TPL 24.85 Increased By ▲ 0.31 (1.26%)
TPLP 12.99 No Change ▼ 0.00 (0%)
TREET 25.91 Decreased By ▼ -0.07 (-0.27%)
TRG 53.73 Increased By ▲ 0.40 (0.75%)
Markets Print edition: 2021-12-29

PRL to undertake expansion project

Published Updated

KARACHI: The board of directors of Pakistan Refinery Limited (PRL) has decided to undertake Refinery Expansion and Upgrade Project (REUP). The objectives of the REUP are compliance with requirement to produce EURO V compliant high speed diesel (HSD) and motor spirit (MS/Petrol); expansion of crude processing capacity to 100,000 barrels per day and to achieve self-sustainability by upgrading from hydro-skimming refinery to deep conversion refinery thereby, significantly reducing production of high sulphur furnace oil (HSFO).

PRL to undertake the front-end engineering design (FEED) study of REUP and appoint the financial advisor, with the successful bidder expected to be in place by quarter ending March 31, 2022, material information sent to Pakistan Stock Exchange on Tuesday said. The project cost is currently estimated at around $1.2 billion on the basis of detailed feasibility study.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.