AVN 64.74 Decreased By ▼ -0.26 (-0.4%)
BAFL 31.23 Increased By ▲ 0.08 (0.26%)
BOP 4.82 Increased By ▲ 0.11 (2.34%)
CNERGY 3.86 Decreased By ▼ -0.02 (-0.52%)
DFML 14.11 Increased By ▲ 0.41 (2.99%)
DGKC 41.69 Increased By ▲ 0.42 (1.02%)
EPCL 46.36 Decreased By ▼ -0.33 (-0.71%)
FCCL 11.41 Decreased By ▼ -0.01 (-0.09%)
FFL 5.06 Increased By ▲ 0.02 (0.4%)
FLYNG 5.78 Decreased By ▼ -0.04 (-0.69%)
GGL 9.92 Decreased By ▼ -0.03 (-0.3%)
HUBC 64.23 Increased By ▲ 0.13 (0.2%)
HUMNL 5.61 Decreased By ▼ -0.04 (-0.71%)
KAPCO 27.84 Increased By ▲ 0.04 (0.14%)
KEL 2.15 Increased By ▲ 0.02 (0.94%)
LOTCHEM 24.52 Increased By ▲ 0.22 (0.91%)
MLCF 21.75 Increased By ▲ 0.35 (1.64%)
NETSOL 84.19 Decreased By ▼ -0.01 (-0.01%)
OGDC 87.30 Decreased By ▼ -0.64 (-0.73%)
PAEL 10.95 Increased By ▲ 0.05 (0.46%)
PIBTL 4.24 Increased By ▲ 0.06 (1.44%)
PPL 76.63 Decreased By ▼ -1.07 (-1.38%)
PRL 13.69 Increased By ▲ 0.07 (0.51%)
SILK 0.90 Increased By ▲ 0.01 (1.12%)
SNGP 41.52 Decreased By ▼ -0.41 (-0.98%)
TELE 5.95 Increased By ▲ 0.08 (1.36%)
TPLP 15.77 Decreased By ▼ -0.01 (-0.06%)
TRG 111.25 Decreased By ▼ -1.05 (-0.93%)
UNITY 13.92 Decreased By ▼ -0.03 (-0.22%)
WTL 1.14 Increased By ▲ 0.01 (0.88%)
BR100 4,046 Decreased By -1.8 (-0.05%)
BR30 14,434 Decreased By -33.1 (-0.23%)
KSE100 40,620 Decreased By -53.1 (-0.13%)
KSE30 15,170 Decreased By -20 (-0.13%)
Business & Finance

Pakistan has requested Iran to normalise power supply to Balochistan: Hammad Azhar

  • Balochistan coastal areas are not connected to the national grid and dependent on Iranian power supply, says energy minister
Published July 29, 2021
Follow us

Minister for Energy Hammad Azhar said on Thursday that the Pakistani authorities have requested the Iranian government to normalise its power supply situation, amid load shedding in Balochistan’s coastal region.

In a series of tweets on Thursday, the federal minister informed that power shortfalls in Iran have led to load shedding in Pakistan’s Gwadar, Turbat and Makraan regions.

“These areas are not connected to the national grid and dependent on Iranian power supply,” said Azhar. The federal minister added that they have taken up the issue with its neighbour and requested them to normalise the power supply.

The port city of Gwadar is a vital cog in the multi-billion dollar China-Pakistan Economic Corridor (CPEC), a $65 billion investment plan aiming to link western China to the southern Pakistani port of Gwadar.

Iran has been hit by severe water shortages in recent weeks, which has led to outages in areas supplied power by hydroelectric plants.

PC shows willingness to share power SPA

Meanwhile, Azhar said that work is also in progress on connecting these areas with the national grid. “This involves laying transmission lines for hundreds of kilometers. This project will be completed within two years,” said Azhar.

Azhar in a meeting with the Iranian ambassador informed that the power outage in some areas of Balochistan is due to power shortfall in Iran.

The Energy Minister urged to restore power supply to Balochistan as soon as possible. The Iranian envoy assured the minister of speedy restoration of power.

On Wednesday, the Secretary Power and CEO Qesco informed the Senate Standing Committee on Power committee that Iran is not supplying 100MW electricity as per the agreement as it is also facing load shedding these days.

Comments

Comments are closed.

Pakistan has requested Iran to normalise power supply to Balochistan: Hammad Azhar

Former interior minister Sheikh Rashid arrested

Jan food prices rise 43pc YoY

High inflation, low growth and falling forex: Country confronted with variety of challenges: MoF

IMF revises inflation rate upward

KE CEO directed to appear before Senate panel

KE files four tariff pleas with Nepra

Officers dealing with IMF exempted from meetings at PMO

PM to open K3 nuclear power plant today

General election not possible before Oct?

Mushtaq appointed DG (Debt)