BR100 Increased By (0.8%)
BR30 Increased By (1.2%)
KSE100 Increased By (0.54%)
KSE30 Increased By (0.6%)
BECO 6.05 Increased By ▲ 0.28 (4.85%)
BML 53.25 Increased By ▲ 0.25 (0.47%)
BOP 34.36 Increased By ▲ 0.37 (1.09%)
CNERGY 8.21 Increased By ▲ 0.10 (1.23%)
DCL 12.22 Increased By ▲ 0.02 (0.16%)
FCCL 53.63 Increased By ▲ 0.80 (1.51%)
FCSC 5.15 Increased By ▲ 0.08 (1.58%)
FFL 18.15 Increased By ▲ 0.20 (1.11%)
FNEL 1.31 Increased By ▲ 0.02 (1.55%)
HUMNL 10.93 Increased By ▲ 0.05 (0.46%)
KEL 8.10 Increased By ▲ 0.08 (1%)
KOSM 5.42 Decreased By ▼ -0.10 (-1.81%)
MLCF 87.50 Increased By ▲ 0.99 (1.14%)
NBP 187.00 Increased By ▲ 1.84 (0.99%)
PACE 10.55 Decreased By ▼ -0.03 (-0.28%)
PAEL 39.90 Increased By ▲ 0.48 (1.22%)
PIAHCLA 26.25 Increased By ▲ 0.03 (0.11%)
PIBTL 17.52 Increased By ▲ 0.85 (5.1%)
PPL 229.66 Increased By ▲ 1.48 (0.65%)
PRL 34.80 Increased By ▲ 0.12 (0.35%)
PTC 67.01 Increased By ▲ 1.68 (2.57%)
SEARL 90.94 Increased By ▲ 0.81 (0.9%)
SSGC 27.15 Increased By ▲ 0.55 (2.07%)
TELE 8.60 Increased By ▲ 0.32 (3.86%)
THCCL 58.25 Decreased By ▼ -0.25 (-0.43%)
TPLP 8.58 Increased By ▲ 0.36 (4.38%)
TREET 24.70 Increased By ▲ 0.17 (0.69%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.05 Increased By ▲ 0.11 (1.11%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)
World

Suez Canal starts dredging work to extend double lane

  • The SCA announced this week that it was planning to extend a second canal lane that opened in 2015 by 10 km to make it 82 km long, and would widen and deepen a single lane stretch at the southern end of the canal.
  • The work had begun following directives from Egyptian President Abdel Fattah al-Sisi "to immediately start implementing the proposed development plan and put in place a timetable for completion as soon as possible".
Published May 15, 2021 Updated May 15, 2021 07:06pm
By

CAIRO: The Suez Canal Authority (SCA) has started dredging work to extend a second lane that allows for two-way traffic in a southern section of the canal near to where a giant container ship got stuck for six days in March, it said on Saturday.

The SCA announced this week that it was planning to extend a second canal lane that opened in 2015 by 10 km to make it 82 km long, and would widen and deepen a single lane stretch at the southern end of the canal.

The work had begun following directives from Egyptian President Abdel Fattah al-Sisi "to immediately start implementing the proposed development plan and put in place a timetable for completion as soon as possible", the SCA said on Saturday.

The grounding of the 440-metre Ever Given container ship in a southern section of the canal from March 23-29 delayed the passage of hundreds of vessels through the waterway, disrupting global trade.

The Ever Given, still loaded with thousands of containers, is being held in the Great Bitter Lake between two stretches of the canal, amid a dispute over an SCA compensation claim against the ship's Japanese owner Shoei Kisen.

Comments

Comments are closed for this article.