BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
Business & Finance

MLCF enhances grey clinker production

  • The capacity of the Line-3 has been increased from 7300 to 7800 tons per day of clinker, this was achieved due to a debottlenecking and Balancing Modernization and Replacement (BMR) program, informed the cement manufacturer.
Published April 6, 2021 Updated April 6, 2021 11:03am

Pakistan’s cement manufacturer, Maple Leaf Cement Factory Limited (MLCF) has enhanced its production capacity, the company announced on Tuesday.

“We hereby formally convey that the existing clinker capacity of our brownfield clinker production Line3 located at Iskendarabad, which commenced its production on May 21, 2019, has been enhanced by 500 tons per day of clinker,” stated MLCF.

The capacity of the Line-3 has been increased from 7300 to 7800 tons per day of clinker, this was achieved due to a debottlenecking and Balancing Modernization and Replacement (BMR) program, informed the cement manufacturer.

After the latest increase, the existing total grey clinker capacity will increase from 18000 tons to 18500 tons per day of clinker.

Days ago, MLCF announced that it has signed a contract with plant supplier Chengdu Design & Research Institute of Building Materials Industry Co Ltd, China, for the supply of equipment and engineering for a 7000tpd dry-process grey clinker Line (No 4), through a brownfield expansion project in Punjab province, Pakistan.

As per details, the agreement was reached on 22 March to enhance its clinker production capacity up to 25,000tpd at the existing plant site at Iskendarabad, district Mianwali, Punjab.

The project is expected to commence trial production in August 2022.

Comments

Comments are closed for this article.