BR100 Decreased By (-0.7%)
BR30 Decreased By (-0.59%)
KSE100 Decreased By (-0.64%)
KSE30 Decreased By (-0.82%)
BECO 5.60 Decreased By ▼ -0.04 (-0.71%)
BML 60.95 Increased By ▲ 2.23 (3.8%)
BOP 37.37 Increased By ▲ 0.24 (0.65%)
CNERGY 8.49 Decreased By ▼ -0.01 (-0.12%)
DCL 11.75 Decreased By ▼ -0.15 (-1.26%)
FCCL 57.75 Decreased By ▼ -0.88 (-1.5%)
FCSC 5.04 Decreased By ▼ -0.01 (-0.2%)
FFL 17.89 Decreased By ▼ -0.21 (-1.16%)
FNEL 1.24 No Change ▼ 0.00 (0%)
HUMNL 11.20 Decreased By ▼ -0.05 (-0.44%)
KEL 8.11 Decreased By ▼ -0.06 (-0.73%)
KOSM 6.37 Decreased By ▼ -0.10 (-1.55%)
MLCF 107.06 Decreased By ▼ -2.45 (-2.24%)
NBP 218.31 Increased By ▲ 0.83 (0.38%)
PACE 11.17 Increased By ▲ 0.02 (0.18%)
PAEL 47.02 Increased By ▲ 0.30 (0.64%)
PIAHCLA 30.66 Increased By ▲ 0.06 (0.2%)
PIBTL 18.62 Decreased By ▼ -0.24 (-1.27%)
PPL 246.82 Decreased By ▼ -5.84 (-2.31%)
PRL 37.25 Increased By ▲ 0.80 (2.19%)
PTC 71.60 Decreased By ▼ -2.36 (-3.19%)
SEARL 99.16 Increased By ▲ 0.17 (0.17%)
SSGC 31.94 Decreased By ▼ -0.41 (-1.27%)
TELE 9.18 Increased By ▲ 0.09 (0.99%)
THCCL 74.20 Increased By ▲ 5.07 (7.33%)
TPLP 13.32 Increased By ▲ 0.78 (6.22%)
TREET 25.86 Increased By ▲ 0.07 (0.27%)
TRG 67.50 Increased By ▲ 0.20 (0.3%)
WAVES 11.51 Increased By ▲ 0.14 (1.23%)
WTL 1.27 Increased By ▲ 0.01 (0.79%)

ISLAMABAD: Sukkur Electric Power Company (Sepco) has sought help of Senior Superintendent of Police (SSP) Sukkur for deployment of police for removal of illegal transformers from Nara Canal at Salehpat.

In a letter to SSP Sukkur, the Executive Engineer (Operation Division) Sepco Rohri, has stated that during checking of agriculture tube-well connections with respect to operation in Sub Division Sepco, Salehpat, it has been found that the connection bearing reference No.29-38153-0661400 in the name of Muhammad Usman at Nara Canal near Mian Ghulam Mustafa Qureshi tube-well on 11 kV industrial feeder 1x200 kVA transformer along with allied material, ie, structure poles/wires have been illegally installed by the consumer instead of originally sanctioned 1x50 kVA transformer at site without its prior permission/approval of Competent Authority.

In this regard, Sepco team headed by the senior officers of Operation Division, Sepco Rohri as well as Operation Circle, Sepco, Sukkur tried to remove the illegal transformer from site on February 25, 2021 but due to resistance of local residents the attempt was unsuccessful.

The Executive Engineer, in his letter, has requested SSP, Sukkur to provide Police protection for the removal of 1x200 kVA illegal transformers at Nara canal Salehpat.

Sepco is one of the worst performing Distribution Company (Discos) with respect to losses and recovery.

Sepco allowed losses are 29 percent whereas globally losses are allowed at less than 10 per cent. Its actual line losses were recorded at 32.5 per cent of which 1.9 percent was T&G whereas T&D losses were 29.6 per cent. The company’s distribution losses were 38.5 per cent of which 1.2 per cent and T&D were 38.6 per cent.

Sepco areas with 20 percent losses are load shedding free. Load shedding is done on the basis of losses, ie, loss plus recovery, thus if losses cross 80 per cent the 12 hour load shedding is carried out.

Last year, Sepco informed a parliamentary panel that it has filed 11365 applications for FIRs during the last three years and only 91 FIRs were registered whereas 11273 FIRs were not registered.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.