BR100 Increased By (0.52%)
BR30 Increased By (0.44%)
KSE100 Increased By (0.46%)
KSE30 Increased By (0.58%)
BECO 5.67 Decreased By ▼ -0.06 (-1.05%)
BML 57.05 Decreased By ▼ -0.25 (-0.44%)
BOP 36.85 Increased By ▲ 0.08 (0.22%)
CNERGY 8.32 Decreased By ▼ -0.07 (-0.83%)
DCL 11.90 Decreased By ▼ -0.14 (-1.16%)
FCCL 58.66 Increased By ▲ 0.05 (0.09%)
FCSC 5.09 Increased By ▲ 0.08 (1.6%)
FFL 18.12 Increased By ▲ 0.18 (1%)
FNEL 1.26 No Change ▼ 0.00 (0%)
HUMNL 11.28 Decreased By ▼ -0.14 (-1.23%)
KEL 8.24 Decreased By ▼ -0.05 (-0.6%)
KOSM 6.54 Decreased By ▼ -0.08 (-1.21%)
MLCF 107.17 Decreased By ▼ -1.12 (-1.03%)
NBP 208.80 Increased By ▲ 2.76 (1.34%)
PACE 11.18 Increased By ▲ 0.01 (0.09%)
PAEL 45.39 Increased By ▲ 0.04 (0.09%)
PIAHCLA 30.31 Decreased By ▼ -0.46 (-1.49%)
PIBTL 18.87 Decreased By ▼ -0.19 (-1%)
PPL 248.71 Increased By ▲ 2.76 (1.12%)
PRL 36.29 Increased By ▲ 0.21 (0.58%)
PTC 74.01 Increased By ▲ 1.65 (2.28%)
SEARL 96.13 Decreased By ▼ -0.54 (-0.56%)
SSGC 31.37 Decreased By ▼ -0.30 (-0.95%)
TELE 9.21 Decreased By ▼ -0.06 (-0.65%)
THCCL 68.04 Increased By ▲ 0.23 (0.34%)
TPLP 11.64 Increased By ▲ 0.41 (3.65%)
TREET 25.72 Decreased By ▼ -0.17 (-0.66%)
TRG 67.62 Decreased By ▼ -0.22 (-0.32%)
WAVES 11.25 Increased By ▲ 0.27 (2.46%)
WTL 1.28 No Change ▼ 0.00 (0%)

KARACHI: Over 90 percent of KE's feeders have been powered up with teams working throughout the night for power restoration.

Rainwater entered over 50 percent of KE's substations during record-breaking rains in Karachi. Restored locations include among others Lee Market, Moosa Lane, Garden, parts of Gulistan-e-Johar, Landhi and Lyari, Korangi, I I Chundrigar, Nazimabad, North Nazimabad, University road, North Karachi, Malir, DHA phase 1, 2 and 8.

Field staff is working at remaining locations as well, while restoration work is impeded in few phases of DHA, Saddar, Clifton and Orangi due to water having entered inside substations. Our teams are working with district and city administration teams to simultaneously drain accumulated rainwater and dry sensitive electrical equipments before powering the substations up.—PR

Copyright Business Recorder, 2020

Comments

Comments are closed for this article.