BR100 Increased By (0.52%)
BR30 Increased By (0.44%)
KSE100 Increased By (0.46%)
KSE30 Increased By (0.58%)
BECO 5.67 Decreased By ▼ -0.06 (-1.05%)
BML 57.05 Decreased By ▼ -0.25 (-0.44%)
BOP 36.85 Increased By ▲ 0.08 (0.22%)
CNERGY 8.32 Decreased By ▼ -0.07 (-0.83%)
DCL 11.90 Decreased By ▼ -0.14 (-1.16%)
FCCL 58.66 Increased By ▲ 0.05 (0.09%)
FCSC 5.09 Increased By ▲ 0.08 (1.6%)
FFL 18.12 Increased By ▲ 0.18 (1%)
FNEL 1.26 No Change ▼ 0.00 (0%)
HUMNL 11.28 Decreased By ▼ -0.14 (-1.23%)
KEL 8.24 Decreased By ▼ -0.05 (-0.6%)
KOSM 6.54 Decreased By ▼ -0.08 (-1.21%)
MLCF 107.17 Decreased By ▼ -1.12 (-1.03%)
NBP 208.80 Increased By ▲ 2.76 (1.34%)
PACE 11.18 Increased By ▲ 0.01 (0.09%)
PAEL 45.39 Increased By ▲ 0.04 (0.09%)
PIAHCLA 30.31 Decreased By ▼ -0.46 (-1.49%)
PIBTL 18.87 Decreased By ▼ -0.19 (-1%)
PPL 248.71 Increased By ▲ 2.76 (1.12%)
PRL 36.29 Increased By ▲ 0.21 (0.58%)
PTC 74.01 Increased By ▲ 1.65 (2.28%)
SEARL 96.13 Decreased By ▼ -0.54 (-0.56%)
SSGC 31.37 Decreased By ▼ -0.30 (-0.95%)
TELE 9.21 Decreased By ▼ -0.06 (-0.65%)
THCCL 68.04 Increased By ▲ 0.23 (0.34%)
TPLP 11.64 Increased By ▲ 0.41 (3.65%)
TREET 25.72 Decreased By ▼ -0.17 (-0.66%)
TRG 67.62 Decreased By ▼ -0.22 (-0.32%)
WAVES 11.25 Increased By ▲ 0.27 (2.46%)
WTL 1.28 No Change ▼ 0.00 (0%)

KARACHI: Divisional Superintendent Pakistan Railways Karachi Arshad Salam Khattak, along with the divisional officers, conducted the annual 'DS Special' from Karachi to Kotri that entailed a meticulous inspection of railway track, level crossings, bridges, stations along with the available record and preparedness of staff for coping untoward incidents.

The fourteen-hour long inspection proceedings commenced from Cantonment Station Karachi and terminated at Kotri while holistically visiting and examining the record at Drigh Road, Malir, Landhi, Jumma Goth, Bin Qasim, Dhabeji, Jangshahi, Ranpathani, Meting, Braudabad, Bholari and Kotri stations.

The 160 kilometres distance between the initial and final stations included en route bridges where the level between the rails was checked with a levelling gauge and strength of bridges was also observed.

The crisis handling and accidental preparedness of gatemen at level crossings along the track was inquired by the DS. The paraphernalia available to the level crossing staff was also checked during the inspection.

Cash prizes were given to the gatemen possessing masterful skills and knowledge pertaining to the train accidents.

The DS also held informal sessions with the available staff at stations and level crossings in order to know the needs and difficulties confronted by them.

He directed the concerned officers for immediately resolving the issues that were apprised to him by the staff.

Copyright Business Recorder, 2020

Comments

Comments are closed for this article.