AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)
Pakistan

Corruption, theft and mismanagement intolerable in power sector: PM

  • The prime minister directed the ministry concerned to furnish an action plan for implementation of the reforms process as per the stipulated time frame.
Published July 30, 2020

ISLAMABAD: Prime Minister Imran Khan Thursday said that it was intolerable and unacceptable to make people take the brunt of mismanagement, theft and corruption in the power sector.

Chairing a meeting to review the reforms process in the power sector, the prime minister said the transformation was inevitable for country’s economic stability.

Minister for Energy Omar Ayub, Planning Minister Asad Umar and Special Assistants to Prime Minister Nadeem Babar and Shahzad Qasim attended the meeting.

The prime minister was briefed on the ongoing reforms process, power supply and demand, modernization of transmission system, reforms in gas sector and efforts for resolution of other chronic issues.

The prime minister directed the ministry concerned to furnish an action plan for implementation of the reforms process as per the stipulated time frame.

He also instructed for strict action against the corrupt elements in gas and power departments creating unnecessary difficulties for the consumers.

Comments

Comments are closed.