BR100 Decreased By (-0.16%)
BR30 Decreased By (-0.26%)
KSE100 Decreased By (-0.21%)
KSE30 Decreased By (-0.28%)
AGHA 6.56 Increased By ▲ 0.04 (0.61%)
BECO 4.27 Decreased By ▼ -0.05 (-1.16%)
BML 57.51 Increased By ▲ 0.47 (0.82%)
BOP 29.08 Decreased By ▼ -0.17 (-0.58%)
CNERGY 12.52 Increased By ▲ 0.13 (1.05%)
CSIL 5.11 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.12 Increased By ▲ 0.05 (0.1%)
FFL 14.03 Increased By ▲ 0.02 (0.14%)
FNEL 1.14 Decreased By ▼ -0.02 (-1.72%)
KEL 6.05 Increased By ▲ 0.09 (1.51%)
KOSM 5.38 No Change ▼ 0.00 (0%)
LOTCHEM 26.38 Decreased By ▼ -0.22 (-0.83%)
MLCF 90.63 Decreased By ▼ -0.32 (-0.35%)
NBP 158.42 Decreased By ▼ -2.32 (-1.44%)
NCPL 50.97 Decreased By ▼ -0.26 (-0.51%)
NPL 54.98 Decreased By ▼ -1.01 (-1.8%)
OGDC 306.12 Decreased By ▼ -2.54 (-0.82%)
PACE 9.78 Increased By ▲ 0.21 (2.19%)
PAEL 33.96 Increased By ▲ 0.23 (0.68%)
PIBTL 13.52 Decreased By ▼ -0.06 (-0.44%)
PPL 218.94 Increased By ▲ 0.59 (0.27%)
PRL 93.07 Increased By ▲ 1.95 (2.14%)
PTC 58.84 Decreased By ▼ -1.25 (-2.08%)
SSGC 23.06 Increased By ▲ 0.02 (0.09%)
TBL 9.33 Increased By ▲ 0.37 (4.13%)
TELE 7.17 No Change ▼ 0.00 (0%)
TPL 20.17 Increased By ▲ 0.76 (3.92%)
TPLP 12.38 Increased By ▲ 0.58 (4.92%)
TREET 23.72 Increased By ▲ 1.47 (6.61%)
TRG 55.29 Increased By ▲ 0.07 (0.13%)
Pakistan

Power generation taken to 17000MW in three months: Pervaiz Rashid

Published Updated

imageISLAMABAD: Information Minister Pervaiz Rashid has said the government is striving to exploit the vast potential of renewable energy to meet the growing energy requirements of the country.

He was speaking at a function in connection with biomass energy project in Islamabad on Friday. The project will be completed in four years with the cooperation of United Nations Industrial Development Organization.

The Minister said several wind energy projects are in the pipeline and 2500 megawatt of electricity will be generated through this source by 2015.

Similarly‚ attention is also being given to exploit the potential of solar energy.

He said Pakistan is an agriculture country and has abundant resources of biomass‚ which could be utilized to significantly meet the requirements of industrial sector hit hard by the energy crisis.

Pervaiz Rashid pointed out the country was facing shortfall of five thousand megawatt when the present government assumed the power. He said the government retired circular debt of about four hundred and eighty billion rupees‚ which increased the power generation to record 17000 megawatt.

He said steps have also been taken to remove inefficiency in the transmission system and a campaign is also continuing against those involved in gas and power theft.

The Minister said the government is also taking long term measures to ensure energy security. These measures include coal based Gaddani power project which will add 6600 megawatt of electricity to the system. Work on Neelum Jhelum hydel power project has also been accelerated and this project is now expected to be completed by 2016.

Comments

Comments are closed for this article.