BR100 Increased By (0.25%)
BR30 Increased By (0.67%)
KSE100 Increased By (0.25%)
KSE30 Increased By (0.2%)
AGHA 7.52 Decreased By ▼ -0.01 (-0.13%)
BECO 5.17 Increased By ▲ 0.06 (1.17%)
BML 60.50 Increased By ▲ 2.20 (3.77%)
BOP 34.64 Increased By ▲ 0.06 (0.17%)
CNERGY 14.03 Increased By ▲ 0.35 (2.56%)
CSIL 6.35 Increased By ▲ 0.05 (0.79%)
FCCL 57.40 Decreased By ▼ -0.15 (-0.26%)
FFL 16.33 Decreased By ▼ -0.17 (-1.03%)
FNEL 1.19 Decreased By ▼ -0.01 (-0.83%)
KEL 7.34 Decreased By ▼ -0.02 (-0.27%)
KOSM 5.98 No Change ▼ 0.00 (0%)
LOTCHEM 27.75 Increased By ▲ 0.24 (0.87%)
MLCF 102.20 Increased By ▲ 0.27 (0.26%)
NBP 203.65 Increased By ▲ 0.36 (0.18%)
NCPL 61.30 Increased By ▲ 0.83 (1.37%)
NPL 70.24 Increased By ▲ 0.44 (0.63%)
OGDC 319.39 Increased By ▲ 0.91 (0.29%)
PACE 11.10 Decreased By ▼ -0.02 (-0.18%)
PAEL 42.90 Increased By ▲ 0.04 (0.09%)
PIBTL 16.88 Increased By ▲ 0.16 (0.96%)
PPL 233.60 Increased By ▲ 2.98 (1.29%)
PRL 82.85 Increased By ▲ 6.12 (7.98%)
PTC 72.00 Increased By ▲ 0.82 (1.15%)
SSGC 27.19 Increased By ▲ 0.09 (0.33%)
TBL 10.11 Decreased By ▼ -0.17 (-1.65%)
TELE 8.54 Decreased By ▼ -0.02 (-0.23%)
TPL 23.55 Decreased By ▼ -0.04 (-0.17%)
TPLP 15.53 Increased By ▲ 0.08 (0.52%)
TREET 24.35 Decreased By ▼ -0.16 (-0.65%)
TRG 59.68 Decreased By ▼ -0.41 (-0.68%)
Top News

Singapore metro breaks down for third day in a row

Published Updated

trainSINGAPORE: Disruptions paralysed a new multi-billion-dollar line on Singapore's metro on Wednesday, the third straight day of rush-hour delays on the city-state's gleaming train system.

The problems as commuters rushed to work lasted two hours and affected eight stations on the new 36-kilometre (22-mile) section of the metro, including stops that opened only six months ago.

It came two days after the start of public hearings focusing on a massive disruption in December affecting 127,000 commuters, some stranded for hours underground in the worst breakdown since the metro was inaugurated in 1987.

A series of delays and problems have occurred with increasing regularity since, mostly blamed on mechanical or electrical faults. In the past week alone there have been four disruptions in different sections.

In the latest incident, problems emerged at around 8:05am, when train operator SMRT Corporation announced on Twitter that a "track fault" had led to a shutdown of services between four stations.

An hour later, SMRT said train services in eight stations were disrupted.

The Circle Line, where the problems occurred, cost in excess of US$6.40 billion and a decade to build, according to local media.

"The frequency of the breakdowns is really alarming," Shanta Arul, a 24-year-old corporate communications officer, told AFP.

"The main concern here is that it is a brand-new line. The other breakdowns were on the other older lines but this is new, so it raises questions on maintenance and the quality of equipment and trains they are using."

Another commuter, Evonne Tay, wrote on Facebook that she had switched to buses because train breakdowns were "happening too frequently."

The metro was once regarded as one of Asia's best but its image has suffered because of breakdowns blamed by Singaporeans on mismanagement and overcrowding due to a spike in the intake of foreign workers and immigrants in recent years.

The train system, which includes underground and overhead sections, registered an average 2.41 million passenger trips per day in 2011, according to local media. Official figures were not immediately available.

The train network is split between two operators, SMRT and ComfortDelGro, which also run bus and taxi services.

Copyright AFP (Agence France-Presse), 2012

Comments

Comments are closed for this article.