BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)
Markets

Germany set to have at least 2 LNG terminals: minister

Published Updated

BERLIN: German Economy Minister Peter Altmaier said on Tuesday he was optimistic that Germany would build two terminals in the foreseeable future to import liquefied natural gas (LNG).

As Germany phases out nuclear power and coal, it is increasingly turning to gas to compliment renewable energy sources. It is under pressure, especially from the United States, to cut its dependence on Russian gas and buy in LNG.

Altmaier told a meeting with German and US energy officials and industry lobbyists that Germany was weighing up the extent of state subsidies and regulations before private investors build the terminals needed for LNG imports.

Of three sites under consideration - Brunsbuettel, Stade and Wilhelmshaven - Altmaier was confident terminals would be built at two in the foreseeable future.

"All three projects are (being) carefully considered and examined," he said. "I am quite optimistic that at least two of the terminals will be realised within a very foreseeable period of time."

Altmaier made clear that the question of LNG was a separate issue to Nord Stream 2 pipeline, backed by Germany, which will bring Russian gas to Europe under the Baltic Sea, bypassing Ukrainian pipelines.

Ukraine is concerned that the 1,225 km (760 mile) pipeline will lead to a dramatic loss in transport revenues but Germany is trying to reassure Kiev that gas will still be transported from Russia through Ukraine's existing pipeline.

"The intention is to come as soon as possible ... to a new agreement between Russia and Ukraine," he said.

Copyright Reuters, 2019

Comments

Comments are closed for this article.