AIRLINK 72.80 Increased By ▲ 0.62 (0.86%)
BOP 5.06 Increased By ▲ 0.13 (2.64%)
CNERGY 4.33 Decreased By ▼ -0.02 (-0.46%)
DFML 30.52 Increased By ▲ 2.03 (7.13%)
DGKC 85.95 Increased By ▲ 4.65 (5.72%)
FCCL 22.35 Increased By ▲ 0.85 (3.95%)
FFBL 33.22 Increased By ▲ 0.17 (0.51%)
FFL 9.78 Decreased By ▼ -0.08 (-0.81%)
GGL 10.40 Decreased By ▼ -0.08 (-0.76%)
HBL 113.62 Decreased By ▼ -0.38 (-0.33%)
HUBC 136.20 Decreased By ▼ -3.80 (-2.71%)
HUMNL 10.03 Increased By ▲ 1.00 (11.07%)
KEL 4.66 Decreased By ▼ -0.07 (-1.48%)
KOSM 4.40 Increased By ▲ 0.02 (0.46%)
MLCF 38.35 Increased By ▲ 0.70 (1.86%)
OGDC 133.40 Decreased By ▼ -0.30 (-0.22%)
PAEL 27.40 Increased By ▲ 1.80 (7.03%)
PIAA 24.76 Increased By ▲ 0.78 (3.25%)
PIBTL 6.55 Increased By ▲ 0.07 (1.08%)
PPL 121.21 Decreased By ▼ -1.41 (-1.15%)
PRL 27.15 Increased By ▲ 0.08 (0.3%)
PTC 13.89 Increased By ▲ 0.29 (2.13%)
SEARL 60.40 Increased By ▲ 3.78 (6.68%)
SNGP 68.53 Decreased By ▼ -0.71 (-1.03%)
SSGC 10.33 Decreased By ▼ -0.01 (-0.1%)
TELE 9.05 Increased By ▲ 0.60 (7.1%)
TPLP 11.26 Decreased By ▼ -0.02 (-0.18%)
TRG 65.70 Increased By ▲ 4.49 (7.34%)
UNITY 25.25 Decreased By ▼ -0.08 (-0.32%)
WTL 1.50 No Change ▼ 0.00 (0%)
BR100 7,608 Decreased By -22.2 (-0.29%)
BR30 25,091 Increased By 100.6 (0.4%)
KSE100 72,658 Increased By 56.2 (0.08%)
KSE30 23,383 Decreased By -155.9 (-0.66%)

Federal and Balochistan Governments will share the cost of over rupees one billion "Construction of Groyne Wall, Breakwater and allied works at Eastbay (Demizer), Gwadar" project equally to facilitate the local fishermen, to be displaced due to construction of Eastbay Expressway.
The main purpose of the project is to provide a Breakwater at Eastbay (Demizer), Gwadar to facilitate the fishermen which are going to be displaced from the existing fish harbor cum mini port for undertaking the other development works by the Chinese Operator of the Port and Construction of Eastbay Expressway, according to official documents of Planning Commission available with Business Recorder.
The existing Gwadar Fish Harbor is to be closed from the operational premises of Gwadar Port to enable deepening of the Port's Shipping Channel as well as undertaking of other development works by the Chinese Operator of the port.
The Chinese team started work on Eastbay Expressway at Demizer. The fishermen recorded their reservations on the construction of Eastbay Expressway and the area representatives also raised this issue on different forums including National Assembly, Provincial Assembly and Senate.
The local Fishermen approached Chief Minister Balochistan with the demand to develop a boat parking yard including breakwater and allied facilities at Demizer. The Chief Minister Balochistan directed Gwadar Development Authority (GDA) to take this issue on immediate knots and prepare PC-I for further processing.
The GDA surveyed the site on the directions of the Chief Minister Balochistan and it was decided to construct a breakwater so that fishermen can park their vessels inside the barricaded area as there would be no space available due to construction of Gwadar Eastbay Expressway at Eastbay (Demizer).
The project envisages construction of 1775 meters long and six meters wide stone groyne wall, training wall, auction hall, boats repair area and boat basin as parking yard with allied facilities at Eastbay Gwadar.

Copyright Business Recorder, 2019

Comments

Comments are closed.