BR100 Decreased By (-1.07%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.89%)
KSE30 Decreased By (-1.04%)
BECO 5.57 Decreased By ▼ -0.26 (-4.46%)
BML 60.50 Increased By ▲ 2.60 (4.49%)
BOP 33.26 Decreased By ▼ -0.53 (-1.57%)
CNERGY 8.04 Decreased By ▼ -0.11 (-1.35%)
DCL 11.31 Decreased By ▼ -0.48 (-4.07%)
FCCL 53.01 Decreased By ▼ -0.48 (-0.9%)
FCSC 5.37 Decreased By ▼ -0.03 (-0.56%)
FFL 17.62 Decreased By ▼ -0.22 (-1.23%)
FNEL 1.32 Increased By ▲ 0.02 (1.54%)
HUMNL 11.15 Increased By ▲ 0.04 (0.36%)
KEL 7.87 Decreased By ▼ -0.15 (-1.87%)
KOSM 5.34 Decreased By ▼ -0.11 (-2.02%)
MLCF 85.15 Decreased By ▼ -2.25 (-2.57%)
NBP 181.75 Decreased By ▼ -2.49 (-1.35%)
PACE 11.55 Decreased By ▼ -0.07 (-0.6%)
PAEL 39.50 Decreased By ▼ -0.75 (-1.86%)
PIAHCLA 25.61 Decreased By ▼ -0.51 (-1.95%)
PIBTL 17.15 Increased By ▲ 0.01 (0.06%)
PPL 224.75 Decreased By ▼ -3.98 (-1.74%)
PRL 34.30 Decreased By ▼ -0.19 (-0.55%)
PTC 65.00 Decreased By ▼ -2.54 (-3.76%)
SEARL 89.81 Decreased By ▼ -1.12 (-1.23%)
SSGC 26.37 Decreased By ▼ -0.46 (-1.71%)
TELE 8.43 Decreased By ▼ -0.10 (-1.17%)
THCCL 69.18 Increased By ▲ 3.04 (4.6%)
TPLP 10.33 Increased By ▲ 1.00 (10.72%)
TREET 24.22 Decreased By ▼ -0.29 (-1.18%)
TRG 69.55 Decreased By ▼ -2.06 (-2.88%)
WAVES 11.03 Increased By ▲ 0.05 (0.46%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

ISLAMABAD: National Highway Authority (NHA) has invited applications from the eligible National and International firms for pre-qualification of "Electro Mechanical Works of Lowari Tunnel Project" on Design-Build Basis.

The works include tunnel ventilation, lighting system, air quality measurement system, closed circuit telephone system, emergency call, telephone and radio system, public address system and tunnel fittings, traffic management system and toll station, fire detection and fire fighting system, supervisory control and data acquisition (SCADA) and tele-control system, power generation, emergency power and earthing, E and M portal buildings and associated civil works.

The interested firms can submit pre-qualification applications, prepared in accordance with the instructions provided in the pre-qualification documents by April 23.

The pre-qualification applications will be opened on the same day.

It is worth a mention that the NHA has undertaken the project of Lowari Tunnel including two lane road tunnels of 8.5 Km and 1.9 km at an altitude of about 8,000 feet between Dir and Chitral.

The civil works of the two tunnels have been completed including concrete lining, ceiling and road.

 

 

Copyright APP (Associated Press of Pakistan), 2018
 

 

 

Comments

Comments are closed for this article.