BR100 Increased By (0.27%)
BR30 Increased By (0.15%)
KSE100 Increased By (0.21%)
KSE30 Increased By (0.06%)
BECO 5.92 Decreased By ▼ -0.11 (-1.82%)
BML 57.31 Increased By ▲ 4.56 (8.64%)
BOP 34.09 Decreased By ▼ -0.16 (-0.47%)
CNERGY 8.20 Increased By ▲ 0.04 (0.49%)
DCL 12.15 Decreased By ▼ -0.19 (-1.54%)
FCCL 53.88 Decreased By ▼ -0.01 (-0.02%)
FCSC 5.25 Increased By ▲ 0.03 (0.57%)
FFL 18.01 Decreased By ▼ -0.02 (-0.11%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.23 Increased By ▲ 0.23 (2.09%)
KEL 8.17 Increased By ▲ 0.06 (0.74%)
KOSM 5.47 Increased By ▲ 0.09 (1.67%)
MLCF 88.79 Increased By ▲ 0.74 (0.84%)
NBP 186.50 Increased By ▲ 0.02 (0.01%)
PACE 10.96 Increased By ▲ 0.24 (2.24%)
PAEL 40.42 Increased By ▲ 0.48 (1.2%)
PIAHCLA 26.26 Increased By ▲ 0.09 (0.34%)
PIBTL 17.33 Increased By ▲ 0.01 (0.06%)
PPL 232.00 Decreased By ▼ -0.78 (-0.34%)
PRL 34.70 Decreased By ▼ -0.25 (-0.72%)
PTC 66.80 Decreased By ▼ -0.76 (-1.12%)
SEARL 91.45 Increased By ▲ 0.52 (0.57%)
SSGC 27.15 Decreased By ▼ -0.02 (-0.07%)
TELE 8.70 Increased By ▲ 0.13 (1.52%)
THCCL 65.35 Increased By ▲ 5.22 (8.68%)
TPLP 9.20 Increased By ▲ 0.44 (5.02%)
TREET 24.55 Increased By ▲ 0.01 (0.04%)
TRG 72.63 Increased By ▲ 0.88 (1.23%)
WAVES 10.70 Increased By ▲ 0.72 (7.21%)
WTL 1.26 No Change ▼ 0.00 (0%)

Power House No 3 of Satpara Dam Project with installed capacity of 2360 kilowatt (KW) has started power generation on Friday. The under-construction Power House No 4 with an installed capacity of 1400 KW is also scheduled to go into operation by the end of this month.
With the completion of these two power houses, Satpara Dam Power Complex will attain the installed capacity of 17.36 megawatt (MW). Power House No 3 and 4 utilise the water used for running the Power House No 2, as cascade system for electricity generation. It may be mentioned that Power House No 1 and 2 of Satpara Dam Project have been in operation since October 2007 and December 2008, respectively, and have contributed over 140 million units of low-cost hydro electricity providing much needed relief to the local populace.
Satpara Dam - the first-ever mega water and power project in Gilgit-Baltistan is located in the vicinity of Skardu town. The project consists of three components including a dam, irrigation system and a power complex comprising four power houses. The dam was completed in July 2010 and the irrigation system in 2012. The United States Agency for International Development (USAID) provided a grant of US $26 million to help complete Satpara Dam Project. The dam has a water storage capacity of 93,000 acre feet to irrigate more than 15,000 acres of land. The project is also providing 3.1 million gallons of potable water daily to the local populace.

Copyright Business Recorder, 2013

Comments

Comments are closed for this article.