BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

This is apropos an article titled “A power crisis of geography” carried Business Recorder on 20 April 2026. The NGC spokesperson has said the article raises concerns regarding regional imbalances in Pakistan’s power system and the need for closer alignment between industrial growth and energy availability.

However, transmission planning is carried out based on projected demand, committed generation, fuel availability, and financial constraints, all of which evolve over time.

The current system stress has come to the surface primarily due to recent external disruptions, including the ongoing war-related impacts on fuel supply—particularly RLNG—which affected generation availability in the north. Additionally, system stability requirements, especially during periods of low hydel availability, necessitate continued operation of generation in the north, underscoring the operational complexity beyond simple geographic considerations.

Transmission infrastructure is developed with long lead times and is designed to ensure long-term reliability, flexibility, and resilience rather than short-term optimization. Several major north–south corridors and reinforcement projects have already been implemented or are under development to manage evolving power flows. While aligning industrial demand with energy availability is a useful long-term policy direction, it complements—not substitutes—the requirement for a strong and integrated national grid. Going forward, enhanced coordination across generation, fuel supply, transmission planning, and demand development—through integrated energy planning—will be key to ensuring efficient and sustainable system operation.

Muhamad Ibrahim (General Manager (Media & PR), Lahore)

Copyright Business Recorder, 2026

Comments

200 characters remaining