BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

HYDERABAD: Chief Secretary Sindh Syed Asif Hyder Shah held another meeting here to review the construction of the dual carriageway road from Jamshoro to Sehwan and related issues.

He said that NHA has delayed a lot in construction of this road. He regretted that precious lives are being lost due to non-completion of the road. He said that he was told that 115 people died and 317 were injured from 2019 till now, which is very sad.

Giving a briefing, NHA officials said that the dual carriageway will be completed by June 2024. They said that there are ten dangerous sharp turns on the Indus Highway, which cause ninety percent of accidents.

Chief Secretary further said that water flows should be taken care in the view of climate changes, culverts should be constructed in the carriageway and road should be constructed considering the rains of 2022. Motorway police was directed to increase the number of patrolling police, besides establishing a control room.

Another meeting about the development carried out in Hyderabad was conducted by the chief secretary Sindh. He was briefed by Mayor Hyderabad Kashif Shoro about the construction of Abdul Sattar Edhi Road and Autobahn Road. He said encroachments and a high transmission line of HESCO are the big hindrances in construction of these roads. Chief Secretary directed the commissioner Hyderabad Ahsan Qureshi to make it convenient to remove those obstacles.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.