BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)

LAHORE: As per the directives from government of Pakistan and the government of Punjab, Central Business District Punjab (CBD Punjab) is fully prepared to tackle the upcoming monsoon season head-on.

Taking immediate action, the CBD Punjab has installed temporary seven drainage pumps on emergency basis to effectively address the rainfall expected during the upcoming monsoon spell.

These strategically placed pumps will ensure efficient water drainage and minimize the risk of water accumulation in Kalma Underpass CBD Punjab Boulevard.

At Kalma Underpass CBD Punjab Boulevard, two pumps with capacities of six cusecs and three cusecs have been installed, equipped with both WAPDA and generator backup.

Similarly, Saint Mary Park in Lahore now features one pump with a capacity of six cusecs and another with a capacity of three cusecs, supported by WAPDA and generator backup.

Additionally, Ali Zaib Road has been equipped with two pumps of six cusecs each and one pump of three cusecs, providing effective rainwater drainage with the assistance of both WAPDA and generator backup.

Furthermore, the contractor has received three pumps today with a capacity of eight cusecs each whose installation will be started within the next 24 hours.

The CBD Punjab remains committed to the safety and well-being of its citizens during the monsoon season. The organization urges the public to remain vigilant, follow safety guidelines, and report any emergency situations to the authorities.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.