AIRLINK 74.10 Increased By ▲ 0.10 (0.14%)
BOP 5.00 Decreased By ▼ -0.02 (-0.4%)
CNERGY 4.46 Increased By ▲ 0.04 (0.9%)
DFML 39.30 Increased By ▲ 0.10 (0.26%)
DGKC 86.20 Increased By ▲ 0.11 (0.13%)
FCCL 21.75 Increased By ▲ 0.10 (0.46%)
FFBL 34.16 Increased By ▲ 0.15 (0.44%)
FFL 9.93 Increased By ▲ 0.01 (0.1%)
GGL 10.65 Increased By ▲ 0.09 (0.85%)
HBL 114.15 Increased By ▲ 0.26 (0.23%)
HUBC 135.84 No Change ▼ 0.00 (0%)
HUMNL 11.73 Decreased By ▼ -0.17 (-1.43%)
KEL 4.85 Increased By ▲ 0.01 (0.21%)
KOSM 4.60 Increased By ▲ 0.07 (1.55%)
MLCF 38.30 Increased By ▲ 0.03 (0.08%)
OGDC 135.00 Increased By ▲ 0.15 (0.11%)
PAEL 26.65 Increased By ▲ 0.30 (1.14%)
PIAA 19.24 Decreased By ▼ -1.56 (-7.5%)
PIBTL 6.77 Increased By ▲ 0.09 (1.35%)
PPL 123.10 Increased By ▲ 0.10 (0.08%)
PRL 27.60 Increased By ▲ 0.91 (3.41%)
PTC 14.50 Increased By ▲ 0.17 (1.19%)
SEARL 59.00 Decreased By ▼ -0.12 (-0.2%)
SNGP 69.21 Decreased By ▼ -0.29 (-0.42%)
SSGC 10.35 Increased By ▲ 0.02 (0.19%)
TELE 8.53 Increased By ▲ 0.03 (0.35%)
TPLP 11.17 Decreased By ▼ -0.06 (-0.53%)
TRG 65.00 Increased By ▲ 0.15 (0.23%)
UNITY 26.30 Increased By ▲ 0.05 (0.19%)
WTL 1.34 No Change ▼ 0.00 (0%)
BR100 7,861 Increased By 10 (0.13%)
BR30 25,339 Increased By 2.5 (0.01%)
KSE100 75,336 Increased By 129.3 (0.17%)
KSE30 24,183 Increased By 40.8 (0.17%)

LAHORE: As per the directives from government of Pakistan and the government of Punjab, Central Business District Punjab (CBD Punjab) is fully prepared to tackle the upcoming monsoon season head-on.

Taking immediate action, the CBD Punjab has installed temporary seven drainage pumps on emergency basis to effectively address the rainfall expected during the upcoming monsoon spell.

These strategically placed pumps will ensure efficient water drainage and minimize the risk of water accumulation in Kalma Underpass CBD Punjab Boulevard.

At Kalma Underpass CBD Punjab Boulevard, two pumps with capacities of six cusecs and three cusecs have been installed, equipped with both WAPDA and generator backup.

Similarly, Saint Mary Park in Lahore now features one pump with a capacity of six cusecs and another with a capacity of three cusecs, supported by WAPDA and generator backup.

Additionally, Ali Zaib Road has been equipped with two pumps of six cusecs each and one pump of three cusecs, providing effective rainwater drainage with the assistance of both WAPDA and generator backup.

Furthermore, the contractor has received three pumps today with a capacity of eight cusecs each whose installation will be started within the next 24 hours.

The CBD Punjab remains committed to the safety and well-being of its citizens during the monsoon season. The organization urges the public to remain vigilant, follow safety guidelines, and report any emergency situations to the authorities.

Copyright Business Recorder, 2023

Comments

Comments are closed.