BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

ISLAMABAD: Karachi Electric (KE) has again sought support from Managing Director, National Transmission and Despatch Company (NTDC) for restoration of Cross Tripping Protection Scheme.

KE has written has three letters regarding the visibility of Cross Trip Protection Scheme in Network Control Centre of KE that has been disabled by NTDC team since November 19, 2021.

In a letter to MD NTDC, KE has stated that it has been approaching NTDC repeatedly for the restoration of the visibility of this scheme in Network Control Centre of KE through different correspondences.

A proposal was submitted in this regard to formulate a technical committee of NTDC and KE engineers with nominations from KE side to amicably resolve the matter, but no response has been received from NTDC as yet.

KE maintains that on the day of power breakdown in NTDC system on October 13, 2022, NPCC while restoring their part of power system, carried out the switching off operations of the breakers at 500-kV NKI grid without intimating KE Network Control engineers. These operations at 12:22 Hours triggered the activation logic of CTS and some 550MW load that was restored in KE network through their own back start facilities which collapsed again due to severe frequent variations caused by load ejected through CTS logic.

Had the visibility of CTS been available at KE network Control Centre, KE LDC engineers would have contacted the NPCC immediately to stop the switching. This incident further fortifies KE’s stance for the importance of the visibility network control centre.

KE, in its letter to MD NTDC, has requested that the visibility of KE Network Control system be restored.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.