BR100 Increased By (1.73%)
BR30 Increased By (1.95%)
KSE100 Increased By (1.89%)
KSE30 Increased By (1.95%)
BECO 5.71 No Change ▼ 0.00 (0%)
BML 58.71 Decreased By ▼ -0.96 (-1.61%)
BOP 36.38 Increased By ▲ 0.65 (1.82%)
CNERGY 8.33 Increased By ▲ 0.05 (0.6%)
DCL 11.86 Decreased By ▼ -0.27 (-2.23%)
FCCL 57.51 Increased By ▲ 0.12 (0.21%)
FCSC 5.42 Decreased By ▼ -0.10 (-1.81%)
FFL 18.06 Increased By ▲ 0.03 (0.17%)
FNEL 1.34 Decreased By ▼ -0.01 (-0.74%)
HUMNL 11.67 Increased By ▲ 0.01 (0.09%)
KEL 8.14 Increased By ▲ 0.07 (0.87%)
KOSM 6.06 Decreased By ▼ -0.20 (-3.19%)
MLCF 97.67 Decreased By ▼ -0.46 (-0.47%)
NBP 206.61 Increased By ▲ 8.28 (4.17%)
PACE 11.76 Decreased By ▼ -0.01 (-0.08%)
PAEL 43.56 Increased By ▲ 0.47 (1.09%)
PIAHCLA 27.95 Increased By ▲ 0.60 (2.19%)
PIBTL 18.35 Increased By ▲ 0.39 (2.17%)
PPL 238.89 Increased By ▲ 6.11 (2.62%)
PRL 36.27 Increased By ▲ 0.58 (1.63%)
PTC 67.99 Increased By ▲ 0.41 (0.61%)
SEARL 98.00 Increased By ▲ 3.72 (3.95%)
SSGC 30.43 Increased By ▲ 2.77 (10.01%)
TELE 9.54 Increased By ▲ 0.35 (3.81%)
THCCL 68.69 Decreased By ▼ -1.90 (-2.69%)
TPLP 11.27 Decreased By ▼ -0.10 (-0.88%)
TREET 26.25 Increased By ▲ 0.83 (3.27%)
TRG 70.42 Increased By ▲ 1.57 (2.28%)
WAVES 11.40 Increased By ▲ 0.15 (1.33%)
WTL 1.29 No Change ▼ 0.00 (0%)
Technology

NASA’s Moon mission pushed back, again

Published September 13, 2022 Updated September 13, 2022 12:14pm
By

WASHINGTON: NASA is now targeting September 27 as the earliest possible launch date for its uncrewed Artemis 1 mission to the Moon, the agency said in a blog post Monday.

The date would depend on engineering teams successfully carrying out a test to fuel up the Space Launch System rocket, and receive a waiver to avoid retesting batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range.

If it does not receive the waiver, the rocket will have to be wheeled back to its assembly building, pushing the timeline back several weeks.

For the September 27 date, a “70-minute launch window opens at 11:37 am EDT,” while the mission would end with an ocean splashdown of the Orion capsule on November 5.

A potential next date comes on October 2.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

Once launched, it will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach.

One of the trip’s main objectives is to test the capsule’s heat shield – which at 16 feet (five meters) in diameter is the largest ever built – when the ship re-enters the atmosphere.

NASA ready for second attempt at Artemis lunar launch

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface, while the third – set for the mid-2020s – would see the first woman and person of color on lunar soil.

NASA wants to build a lunar space station called Gateway and keep a sustained presence on the Moon to gain insight into how to survive very long space missions, ahead of a mission to Mars in the 2030s.

Comments

Comments are closed for this article.