BR100 Increased By (0.64%)
BR30 Increased By (0.68%)
KSE100 Increased By (0.54%)
KSE30 Increased By (0.62%)
AGHA 8.00 Increased By ▲ 0.03 (0.38%)
BECO 5.42 Increased By ▲ 0.01 (0.18%)
BML 65.61 Increased By ▲ 0.12 (0.18%)
BOP 36.10 Increased By ▲ 0.14 (0.39%)
CNERGY 9.69 Increased By ▲ 0.29 (3.09%)
CSIL 5.95 Increased By ▲ 0.01 (0.17%)
FCCL 55.88 Increased By ▲ 0.41 (0.74%)
FFL 17.58 Increased By ▲ 0.10 (0.57%)
FNEL 1.25 Increased By ▲ 0.01 (0.81%)
KEL 8.10 Increased By ▲ 0.16 (2.02%)
KOSM 6.13 Increased By ▲ 0.08 (1.32%)
LOTCHEM 31.46 Increased By ▲ 1.03 (3.38%)
MLCF 104.24 Increased By ▲ 1.47 (1.43%)
NBP 210.57 Increased By ▲ 0.90 (0.43%)
NCPL 60.16 Decreased By ▼ -0.14 (-0.23%)
NPL 68.49 Decreased By ▼ -0.36 (-0.52%)
OGDC 334.13 Increased By ▲ 0.58 (0.17%)
PACE 11.56 Decreased By ▼ -0.16 (-1.37%)
PAEL 45.03 Decreased By ▼ -0.04 (-0.09%)
PIBTL 17.97 Decreased By ▼ -0.05 (-0.28%)
PPL 236.55 Increased By ▲ 0.93 (0.39%)
PRL 42.07 Increased By ▲ 0.22 (0.53%)
PTC 70.99 Increased By ▲ 0.15 (0.21%)
SSGC 30.83 Decreased By ▼ -0.24 (-0.77%)
TBL 10.56 Decreased By ▼ -0.03 (-0.28%)
TELE 9.17 Increased By ▲ 0.17 (1.89%)
TPL 17.47 Decreased By ▼ -0.18 (-1.02%)
TPLP 12.62 Decreased By ▼ -0.05 (-0.39%)
TREET 24.73 Decreased By ▼ -0.07 (-0.28%)
TRG 65.58 Increased By ▲ 0.41 (0.63%)
By

ISLAMABAD: The railway track between Pakistan and Iran is fully functional where an average ten freight trains (5-up/5-down) are being operated on the Quetta-Taftan section per month.

The feasibility study for rehabilitation and improvement of track from Quetta to Taftan was carried out at an estimated cost of us $ 698 million in June, 2019 to design and run the train at 120 kilometres per hour speed, according to an official document.

Pakistan Railways has offered this section for up-gradation to potential investors of different countries including Russia, Kazakhstan, Iran and Belarus on Public Private Partnership (PPP) and Built Operate Transfer (BOT) mode.

About the proposal to extend and connect rail link between Pakistan and Afghanistan under China Pakistan Economic Corridor (CPEC) project, the rail link was discussed in the 5th Joint Cooperation Committee (JCC) meeting held in 2015. However, it has not been included in CPEC project yet.

It was stated that the rail link between Pakistan and Afghanistan via Main Line-1 had been planned through another project of Mazar-e-Sharif-Kabul-Peshawar rail link for which a road map between Uzbekistan, Afghanistan and Pakistan had already been signed.

Comments

Comments are closed for this article.