BR100 Increased By (0.39%)
BR30 Increased By (0.47%)
KSE100 Increased By (0.6%)
KSE30 Increased By (0.7%)
AGHA 6.55 Increased By ▲ 0.23 (3.64%)
BECO 4.40 Increased By ▲ 0.13 (3.04%)
BML 62.43 Decreased By ▼ -0.02 (-0.03%)
BOP 31.38 Increased By ▲ 0.15 (0.48%)
CNERGY 11.79 Increased By ▲ 0.20 (1.73%)
CSIL 5.95 Increased By ▲ 0.23 (4.02%)
FCCL 61.12 Decreased By ▼ -0.42 (-0.68%)
FFL 14.88 Decreased By ▼ -0.14 (-0.93%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.29 Increased By ▲ 0.03 (0.48%)
KOSM 6.00 Increased By ▲ 0.44 (7.91%)
LOTCHEM 24.85 Increased By ▲ 0.17 (0.69%)
MLCF 104.13 Increased By ▲ 0.05 (0.05%)
NBP 174.66 Decreased By ▼ -0.62 (-0.35%)
NCPL 52.83 Increased By ▲ 0.06 (0.11%)
NPL 54.48 Increased By ▲ 0.36 (0.67%)
OGDC 315.35 Increased By ▲ 1.96 (0.63%)
PACE 9.41 Increased By ▲ 0.21 (2.28%)
PAEL 35.62 Decreased By ▼ -0.18 (-0.5%)
PIBTL 13.71 Increased By ▲ 0.24 (1.78%)
PPL 223.38 Increased By ▲ 1.57 (0.71%)
PRL 80.79 Increased By ▲ 1.71 (2.16%)
PTC 47.15 Increased By ▲ 0.30 (0.64%)
SSGC 24.15 Increased By ▲ 0.28 (1.17%)
TBL 9.25 Decreased By ▼ -0.06 (-0.64%)
TELE 7.53 Increased By ▲ 0.14 (1.89%)
TPL 24.89 Decreased By ▼ -0.22 (-0.88%)
TPLP 12.88 Increased By ▲ 0.37 (2.96%)
TREET 26.10 Decreased By ▼ -0.15 (-0.57%)
TRG 53.75 Increased By ▲ 0.31 (0.58%)

Spanish train operator Renfe on Thursday said it had signed a $6-billion deal with US rail developer Texas Central to design, build and run the United States' first-ever high-speed rail line In a statement, Spain's transport ministry said the 5.5-billion-euro agreement would see Renfe working alongside its US partner to develop and operate a line between Houston and Dallas which would begin operating in 2042.

The two firms have signed a preliminary agreement but it is still in draft phase, said Renfe, Spain's national rail operator. Italian construction and engineering firm Salini Impregilo will be in charge of building the 386-kilometre (240-mile) line, which should be finished by 2026, the statement said. For Renfe, the design and construction phase of the contract, which will run to 2026, is worth some $311 million, while the operation and maintenance of the line between 2026 and 2042 will bring in some $5.6 billion.

Described by Texas Central as the "bullet train", the service will run between the two cities in under 90 minutes, with one stop en route at Brazos Valley. Texas Central Partners is a private company set up for the rail project, which Renfe has described as the first-ever high-speed line in the United States.

Copyright Agence France-Presse, 2020

Comments

Comments are closed for this article.