AIRLINK 74.60 Decreased By ▼ -0.65 (-0.86%)
BOP 5.14 Increased By ▲ 0.03 (0.59%)
CNERGY 4.50 Decreased By ▼ -0.10 (-2.17%)
DFML 33.00 Increased By ▲ 0.47 (1.44%)
DGKC 88.90 Decreased By ▼ -1.45 (-1.6%)
FCCL 22.55 Decreased By ▼ -0.43 (-1.87%)
FFBL 32.70 Decreased By ▼ -0.87 (-2.59%)
FFL 9.84 Decreased By ▼ -0.20 (-1.99%)
GGL 10.88 Decreased By ▼ -0.17 (-1.54%)
HBL 115.31 Increased By ▲ 0.41 (0.36%)
HUBC 136.63 Decreased By ▼ -0.71 (-0.52%)
HUMNL 9.97 Increased By ▲ 0.44 (4.62%)
KEL 4.63 Decreased By ▼ -0.03 (-0.64%)
KOSM 4.70 No Change ▼ 0.00 (0%)
MLCF 39.70 Decreased By ▼ -0.84 (-2.07%)
OGDC 138.96 Decreased By ▼ -0.79 (-0.57%)
PAEL 26.89 Decreased By ▼ -0.76 (-2.75%)
PIAA 25.15 Increased By ▲ 0.75 (3.07%)
PIBTL 6.84 Decreased By ▼ -0.08 (-1.16%)
PPL 122.74 Decreased By ▼ -2.56 (-2.04%)
PRL 27.01 Decreased By ▼ -0.54 (-1.96%)
PTC 14.00 Decreased By ▼ -0.15 (-1.06%)
SEARL 59.47 Decreased By ▼ -2.38 (-3.85%)
SNGP 71.15 Decreased By ▼ -1.83 (-2.51%)
SSGC 10.44 Decreased By ▼ -0.15 (-1.42%)
TELE 8.65 Decreased By ▼ -0.13 (-1.48%)
TPLP 11.51 Decreased By ▼ -0.22 (-1.88%)
TRG 65.13 Decreased By ▼ -1.47 (-2.21%)
UNITY 25.80 Increased By ▲ 0.65 (2.58%)
WTL 1.41 Decreased By ▼ -0.03 (-2.08%)
BR100 7,819 Increased By 16.2 (0.21%)
BR30 25,577 Decreased By -238.9 (-0.93%)
KSE100 74,664 Increased By 132.8 (0.18%)
KSE30 24,072 Increased By 117.1 (0.49%)

MULTAN: Multan Electric Power Company (Mepco) has completed 50 low tension (LT) schemes during June 2019, to provide new connections and upgradation of the system.

The schemes have been completed at a cost of over Rs 26.6 million.

Additional Chief Engineer Construction MEPCO Sardar said that as per directives of CEO Mepco Engineer Tahir Mahmood, High Tension (HT) and low tension (LT) schemes were being completed across the region on top priority to improvement of the system.

He said that two LT schemes have been completed in Multan circle, one in Bahawalnager, one in Bahawalpur, 13 in DG Khan, 7 in Khanewal, 11 in Rahimyar Khan, 2 in Sahiwal, 2 in Vehari and 5 LT schemes have been completed in Muzaffargarh circle.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed.