BR100 Increased By (0.27%)
BR30 Increased By (0.38%)
KSE100 Increased By (0.51%)
KSE30 Increased By (0.57%)
AGHA 6.48 Increased By ▲ 0.16 (2.53%)
BECO 4.40 Increased By ▲ 0.13 (3.04%)
BML 62.46 Increased By ▲ 0.01 (0.02%)
BOP 31.40 Increased By ▲ 0.17 (0.54%)
CNERGY 11.76 Increased By ▲ 0.17 (1.47%)
CSIL 5.94 Increased By ▲ 0.22 (3.85%)
FCCL 60.96 Decreased By ▼ -0.58 (-0.94%)
FFL 14.88 Decreased By ▼ -0.14 (-0.93%)
FNEL 1.23 No Change ▼ 0.00 (0%)
KEL 6.25 Decreased By ▼ -0.01 (-0.16%)
KOSM 5.95 Increased By ▲ 0.39 (7.01%)
LOTCHEM 24.79 Increased By ▲ 0.11 (0.45%)
MLCF 103.59 Decreased By ▼ -0.49 (-0.47%)
NBP 174.58 Decreased By ▼ -0.70 (-0.4%)
NCPL 53.00 Increased By ▲ 0.23 (0.44%)
NPL 54.50 Increased By ▲ 0.38 (0.7%)
OGDC 315.45 Increased By ▲ 2.06 (0.66%)
PACE 9.40 Increased By ▲ 0.20 (2.17%)
PAEL 35.47 Decreased By ▼ -0.33 (-0.92%)
PIBTL 13.69 Increased By ▲ 0.22 (1.63%)
PPL 223.00 Increased By ▲ 1.19 (0.54%)
PRL 80.75 Increased By ▲ 1.67 (2.11%)
PTC 47.14 Increased By ▲ 0.29 (0.62%)
SSGC 24.19 Increased By ▲ 0.32 (1.34%)
TBL 9.29 Decreased By ▼ -0.02 (-0.21%)
TELE 7.45 Increased By ▲ 0.06 (0.81%)
TPL 24.90 Decreased By ▼ -0.21 (-0.84%)
TPLP 12.84 Increased By ▲ 0.33 (2.64%)
TREET 26.00 Decreased By ▼ -0.25 (-0.95%)
TRG 53.98 Increased By ▲ 0.54 (1.01%)

ISLAMABAD: Pakistan Railways (PR) has discontinued 23 routes of passenger trains due to high cost of maintenance of these sections and less commercial viability of railways operation.

The restoration of the section hence, depends upon availability of resources and commercial viability, an official in the Ministry of Railways told APP.

Giving details of the division vise closed passenger train sections, the official said that three routes were discontinued in Karachi Division including Landhi-Korangi since 1990, Jamrao-Jhudo-Pithoro since 2005 and Karachi Circular Railway since 2003 due to commercial viability.

Likewise, he said that six sections discontinued are of Sukkur Division including Tando Adam-Tharushah-Mehrabpur, Nawabshah-Sakrand, Khanpur-Chachran, Padidan-Tharu Shah- Mehrabpur, Tando Adam-Sakrand-Padidan since 1991 and Jacobabad-Larkana via Silra Shahdad Kot was closed since 2009.

The official said that five routes were closed in Rawalpindi Division including Mandra-Bhaun since 1991, Pind Dadan Khan-Khushab since 2004, Miani-Bhera since 2006, Malakwal-Gharibwal since 2010 and Sargodha-Kundian since 2013.

He said that four sections were closed in Peshawar Division including Mari Indus-Laki Marwat-Tank since 199, Nowshera-Dargai and Mardan-Charsadda since 2000 and Peshawar-Landi Kotal was discontinued as the bridges linking the routes collapsed and were not repaired yet.

In Quetta Division PR has shutdown two routes including Bostan-Zhob since 1991 and Sibbi-Khost since 2006, he added.

The official said that the department has closed two sections in Multan Division including Samasatta-Amruka since 2011 and Bahawalnagar-Fort Abbas since 1997.

PR has closed only one section in Lahore Division Narowal-Chak Amru since 2005 due to less commercial viability of railways operation, the official added.

Copyright APP (Associated Press of Pakistan), 2018
 

 

Comments

Comments are closed for this article.