BR100 Increased By (0.82%)
BR30 Increased By (1.08%)
KSE100 Increased By (0.77%)
KSE30 Increased By (0.82%)
AGHA 6.10 Increased By ▲ 0.01 (0.16%)
BECO 4.03 Increased By ▲ 0.03 (0.75%)
BML 60.70 Decreased By ▼ -1.61 (-2.58%)
BOP 28.65 Increased By ▲ 1.14 (4.14%)
CNERGY 12.80 Increased By ▲ 0.08 (0.63%)
CSIL 4.97 No Change ▼ 0.00 (0%)
FCCL 52.83 Increased By ▲ 0.21 (0.4%)
FFL 12.94 Decreased By ▼ -0.03 (-0.23%)
FNEL 1.12 Increased By ▲ 0.04 (3.7%)
KEL 5.83 Increased By ▲ 0.03 (0.52%)
KOSM 5.30 Increased By ▲ 0.12 (2.32%)
LOTCHEM 24.13 Increased By ▲ 1.20 (5.23%)
MLCF 91.38 Increased By ▲ 0.97 (1.07%)
NBP 164.97 Increased By ▲ 10.18 (6.58%)
NCPL 50.09 Decreased By ▼ -2.44 (-4.64%)
NPL 53.31 Decreased By ▼ -2.66 (-4.75%)
OGDC 303.68 Increased By ▲ 1.22 (0.4%)
PACE 9.30 Increased By ▲ 0.28 (3.1%)
PAEL 32.82 Increased By ▲ 0.07 (0.21%)
PIBTL 13.03 Decreased By ▼ -0.18 (-1.36%)
PPL 215.08 Decreased By ▼ -0.19 (-0.09%)
PRL 94.16 Decreased By ▼ -1.93 (-2.01%)
PTC 42.84 Increased By ▲ 0.38 (0.89%)
SSGC 22.94 Increased By ▲ 0.22 (0.97%)
TBL 9.61 Increased By ▲ 0.78 (8.83%)
TELE 6.81 Increased By ▲ 0.10 (1.49%)
TPL 23.88 Increased By ▲ 2.10 (9.64%)
TPLP 12.44 Increased By ▲ 0.92 (7.99%)
TREET 23.70 Increased By ▲ 1.09 (4.82%)
TRG 53.62 Decreased By ▼ -1.09 (-1.99%)
Pakistan

PM Shehbaz orders two-hour limit on power cuts

  • Directs relevant authorities to take immediate measures to address disruptions in RLNG supplies
Published Updated

Prime Minister Shehbaz Sharif on Friday took notice of increased electricity load shedding in various parts of the country and ordered authorities to ensure that power outages do not exceed two hours in any area.

The prime minister issued the directive while chairing a meeting in Islamabad to review the country’s electricity load management situation.

According to the PM Office, the meeting was informed that power generation had declined due to disruptions in the supply of re-gasified liquefied natural gas (RLNG) amid the prevailing regional situation, including tensions around the Strait of Hormuz and transmission-related difficulties.

The resulting shortfall in generation has forced authorities to undertake load management to maintain a balance between electricity supply and demand, the meeting was told.

Taking into account the regional situation and future energy requirements, PM Shehbaz directed the relevant authorities to take immediate measures to address disruptions in RLNG supplies.

He also ordered the effective utilisation of all available resources to ensure that load shedding in any area remained within the two-hour limit.

The prime minister further directed the establishment of Consumer Grievance Redressal Committees at the level of power distribution companies (Discos) to address public complaints concerning electricity transmission and other related issues.

He instructed that the committees include public representatives and be made fully functional within one week.

The meeting was informed that electricity consumers could register complaints through the 118 helpline, following which they are provided with a token number and an estimated timeframe for resolution.

Officials also briefed the meeting that, except for six electricity consumers in Rajanpur district, power supply to consumers across the country was currently not being affected by the recent monsoon rains.

The meeting was attended by Federal Minister for Planning and Development Ahsan Iqbal, Economic Affairs Minister Ahad Khan Cheema, Climate Change Minister Musadik Malik, Information Minister Attaullah Tarar, Petroleum Minister Ali Pervaiz Malik, Power Division Minister Sardar Awais Ahmad Khan Leghari, Prime Minister’s Adviser Rana Sanaullah, Minister of State for Finance and Railways Bilal Azhar Kiyani and senior government officials.

Comments

200 characters remaining