BR100 Increased By (0.64%)
BR30 Increased By (0.68%)
KSE100 Increased By (0.54%)
KSE30 Increased By (0.62%)
AGHA 8.00 Increased By ▲ 0.03 (0.38%)
BECO 5.42 Increased By ▲ 0.01 (0.18%)
BML 65.61 Increased By ▲ 0.12 (0.18%)
BOP 36.10 Increased By ▲ 0.14 (0.39%)
CNERGY 9.69 Increased By ▲ 0.29 (3.09%)
CSIL 5.95 Increased By ▲ 0.01 (0.17%)
FCCL 55.88 Increased By ▲ 0.41 (0.74%)
FFL 17.58 Increased By ▲ 0.10 (0.57%)
FNEL 1.25 Increased By ▲ 0.01 (0.81%)
KEL 8.10 Increased By ▲ 0.16 (2.02%)
KOSM 6.13 Increased By ▲ 0.08 (1.32%)
LOTCHEM 31.46 Increased By ▲ 1.03 (3.38%)
MLCF 104.24 Increased By ▲ 1.47 (1.43%)
NBP 210.57 Increased By ▲ 0.90 (0.43%)
NCPL 60.16 Decreased By ▼ -0.14 (-0.23%)
NPL 68.49 Decreased By ▼ -0.36 (-0.52%)
OGDC 334.13 Increased By ▲ 0.58 (0.17%)
PACE 11.56 Decreased By ▼ -0.16 (-1.37%)
PAEL 45.03 Decreased By ▼ -0.04 (-0.09%)
PIBTL 17.97 Decreased By ▼ -0.05 (-0.28%)
PPL 236.55 Increased By ▲ 0.93 (0.39%)
PRL 42.07 Increased By ▲ 0.22 (0.53%)
PTC 70.99 Increased By ▲ 0.15 (0.21%)
SSGC 30.83 Decreased By ▼ -0.24 (-0.77%)
TBL 10.56 Decreased By ▼ -0.03 (-0.28%)
TELE 9.17 Increased By ▲ 0.17 (1.89%)
TPL 17.47 Decreased By ▼ -0.18 (-1.02%)
TPLP 12.62 Decreased By ▼ -0.05 (-0.39%)
TREET 24.73 Decreased By ▼ -0.07 (-0.28%)
TRG 65.58 Increased By ▲ 0.41 (0.63%)

KARACHI: The Karachi Water and Sewerage Corporation (KWSC) has finalised comprehensive arrangements to ensure an uninterrupted water supply and effective sewerage services across the city during Eid-ul-Adha.

According to the KWSC spokesman, the measures have been implemented on the directives of Mayor Karachi Barrister Murtaza Wahab, who also serves as Chairman of the water body under the supervision of Chief Executive Officer Ahmed Ali Siddiqui.

The spokesman said special arrangements had been made around mosques, eidgahs, imambargahs, and religious seminaries to ensure smooth water supply and drainage services during the Eid holidays.

Despite the public holidays, KWSC officers and staff will remain on duty and maintain a high level of preparedness to respond to any emergency situation.

All executive engineers have been directed to stay in their respective areas along with operational staff and machinery on a around-the-clock basis to promptly address public complaints and technical issues.

Copyright Business Recorder, 2026

Comments

200 characters remaining