BR100 Increased By (0.2%)
BR30 Increased By (0.41%)
KSE100 Increased By (0.07%)
KSE30 Increased By (0.23%)
AGHA 7.75 Decreased By ▼ -0.17 (-2.15%)
BECO 5.19 Decreased By ▼ -0.01 (-0.19%)
BML 58.66 Decreased By ▼ -0.59 (-1%)
BOP 33.69 Increased By ▲ 0.01 (0.03%)
CNERGY 10.61 Increased By ▲ 0.80 (8.15%)
CSIL 5.30 Decreased By ▼ -0.12 (-2.21%)
FCCL 53.74 Increased By ▲ 0.22 (0.41%)
FFL 16.46 Decreased By ▼ -0.22 (-1.32%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 7.28 Decreased By ▼ -0.07 (-0.95%)
KOSM 5.64 Increased By ▲ 0.03 (0.53%)
LOTCHEM 29.65 Increased By ▲ 0.54 (1.86%)
MLCF 96.36 Increased By ▲ 0.86 (0.9%)
NBP 203.53 Decreased By ▼ -0.82 (-0.4%)
NCPL 56.85 Decreased By ▼ -1.39 (-2.39%)
NPL 67.31 Decreased By ▼ -0.48 (-0.71%)
OGDC 318.22 Increased By ▲ 0.28 (0.09%)
PACE 10.63 Decreased By ▼ -0.08 (-0.75%)
PAEL 41.77 Decreased By ▼ -0.06 (-0.14%)
PIBTL 16.81 Increased By ▲ 0.31 (1.88%)
PPL 220.17 Increased By ▲ 0.43 (0.2%)
PRL 49.05 Increased By ▲ 4.46 (10%)
PTC 70.01 Decreased By ▼ -0.76 (-1.07%)
SSGC 29.14 Increased By ▲ 0.21 (0.73%)
TBL 9.77 Decreased By ▼ -0.07 (-0.71%)
TELE 8.82 Increased By ▲ 0.06 (0.68%)
TPL 17.17 Increased By ▲ 0.72 (4.38%)
TPLP 12.51 Increased By ▲ 0.41 (3.39%)
TREET 22.59 Decreased By ▼ -0.21 (-0.92%)
TRG 60.22 Increased By ▲ 0.19 (0.32%)

ISLAMABAD: MOL Pakistan Oil and Gas Company B V, the operator of the Tal Block, has announced the successful appraisal of existing discovered gas and condensate (in traces) from the Lumshiwal Formation in the Bilitang-1 ST-1 exploratory well, located in District Kohat, Khyber Pakhtunkhwa. The well is tested at a rate of 26.5 MMSCFD of natural gas.

The Tal Joint Venture comprises Oil & Gas Development Company Limited (OGDCL), Pakistan Petroleum Limited (PPL), Pakistan Oilfields Limited (POL), Government Holdings (Private) Limited (GHPL), and MOL Pakistan.

The well was spudded on August 10, 2025, and later sidetracked to target improved reservoir quality. It was successfully drilled to a total depth of 4,004 meters TVD. Based on the interpretation of wireline log data, the Lumshiwal Formation was tested at approximately 26.5 million standard cubic feet per day (MMSCFD) of gas (~5,065 BOEPD) at a choke size of 32/64” and a wellhead flowing pressure (WHFP) of 4,214 psi.

READ ALSO: OGDCL discovers oil & gas in Khyber Pakhtunkhwa

Ali Murtaza Abbas, Regional Vice President Middle East, Africa & Pakistan, MOL Group, congratulated MOL Pakistan on the achievement, stating, “This success was made possible through a high degree of technical innovation and timely decision-making by the joint venture partners.” He also thanked the Federal Minister for Petroleum and Natural Resources, Mr. Ali Pervaiz Malik, for his continued support.

This appraisal of an existing discovery has de-risked further exploration in the Tal Block, unlocking new upside opportunities. The discovery will also contribute to enhancing the country’s energy security through indigenous resources while adding to the hydrocarbon reserves base of MOL, its joint venture partners, and Pakistan.

Copyright Business Recorder, 2026

Comments

200 characters remaining