BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

LAHORE: Punjab Housing Minister Bilal Yasin has said that, for the first time in the province’s history, a significant budget has been allocated for drainage and clean water supply initiatives.

“Under the direction of the Punjab Chief Minister, multi-billion-rupee underground drainage projects have been launched as part of a long-term planning framework,” he stated while chairing a meeting to review the progress of ongoing development projects under the Punjab Development Plan. The managing directors of WASA from various districts participated in the meeting via video link, along with the Additional Secretary (Technical), the WASA Punjab Director General, the Deputy Secretary for Housing, and the WASA Additional Director General.

During the meeting, the minister instructed officials to expedite work to ensure effective drainage arrangements are in place before the upcoming monsoon season. He also emphasised that consultants from the public health engineering department should compile reports regarding the quality of work and compliance with standard operating procedures (SOPs) in various districts.

Moreover, the Additional Secretary (Technical) and the WASA Punjab Director General provided the Minister with updates on development work in different districts. They reviewed the monitoring mechanisms and timelines for projects in the initial phase districts in detail. A comprehensive briefing was given on the construction and rehabilitation of existing sewer lines, installation of new sewer lines, construction of storage tanks, and road restoration efforts.

The meeting revealed that 114 dewatering sets, 44 sucker machines, 40 sewer jetting machines, 56 tractor trolleys, 59 winch machines, 43 sewer desilting units, 22 dumpers, 26 wheel excavators, and 25 water browsers will be procured to strengthen drainage operations. Work has already begun at priority sites identified for immediate attention, categorised into three defined segments.

Copyright Business Recorder, 2026

Comments

Comments are closed for this article.