BR100 Decreased By (-1.39%)
BR30 Decreased By (-1.72%)
KSE100 Decreased By (-1.3%)
KSE30 Decreased By (-1.25%)
AGHA 7.92 Decreased By ▼ -0.17 (-2.1%)
BECO 5.20 Decreased By ▼ -0.07 (-1.33%)
BML 59.25 Decreased By ▼ -0.13 (-0.22%)
BOP 33.68 Decreased By ▼ -0.51 (-1.49%)
CNERGY 9.81 Increased By ▲ 0.19 (1.98%)
CSIL 5.42 Decreased By ▼ -0.08 (-1.45%)
FCCL 53.52 Decreased By ▼ -0.63 (-1.16%)
FFL 16.68 Decreased By ▼ -0.16 (-0.95%)
FNEL 1.21 Decreased By ▼ -0.02 (-1.63%)
KEL 7.35 Decreased By ▼ -0.24 (-3.16%)
KOSM 5.61 Decreased By ▼ -0.07 (-1.23%)
LOTCHEM 29.11 Decreased By ▼ -1.32 (-4.34%)
MLCF 95.50 Decreased By ▼ -2.66 (-2.71%)
NBP 204.35 Decreased By ▼ -4.44 (-2.13%)
NCPL 58.24 Decreased By ▼ -1.37 (-2.3%)
NPL 67.79 Decreased By ▼ -2.08 (-2.98%)
OGDC 317.94 Decreased By ▼ -5.42 (-1.68%)
PACE 10.71 Decreased By ▼ -0.36 (-3.25%)
PAEL 41.83 Decreased By ▼ -0.42 (-0.99%)
PIBTL 16.50 Decreased By ▼ -0.32 (-1.9%)
PPL 219.74 Decreased By ▼ -4.99 (-2.22%)
PRL 44.59 Increased By ▲ 2.94 (7.06%)
PTC 70.77 Decreased By ▼ -0.35 (-0.49%)
SSGC 28.93 Decreased By ▼ -0.38 (-1.3%)
TBL 9.84 Decreased By ▼ -0.12 (-1.2%)
TELE 8.76 Decreased By ▼ -0.23 (-2.56%)
TPL 16.45 Decreased By ▼ -0.07 (-0.42%)
TPLP 12.10 Decreased By ▼ -0.67 (-5.25%)
TREET 22.80 Decreased By ▼ -0.26 (-1.13%)
TRG 60.03 Decreased By ▼ -0.42 (-0.69%)

LAHORE: The Punjab Central Business District Development Authority (PCBDDA), also known as Central Business District Punjab (CBD Punjab), continues its commitment to delivering world-class urban infrastructure with CEO CBD Punjab, Imran Amin, conducting a detailed visit to ongoing development projects across CBD Punjab and NSIT City.

During the visit, CEO CBD Punjab Imran Amin assessed progress and quality standards across multiple sites, including CBD VERTEX, CBD Walk, The Second Walk and CBD NSIT City.

Accompanying him were Executive Director Technical Riaz Hussain, Director Architecture & Planning Sameer Aftab Sial, Director Project Management Asif Iqbal, and senior representatives from NESPAK and contractors.

At CBD VERTEX scaffolding installation has been completed, paving the way for interior and exterior finishing works. The CBD Walk project has also made significant headway, with basement excavation and foundational concrete works concluded. The first slab construction is now in progress, reflecting efficient execution.

At CBD NSIT City, CEO CBD Punjab Imran Amin chaired a high-level review meeting and was briefed on ongoing infrastructure works and the Celestia IT & Office Tower project. Asphalt work on the internal road network is underway, while the top slab of the twelfth floor of the tower is nearing completion. Speaking on the occasion, CEO CBD Punjab Imran Amin stated, “All development initiatives under CBD Punjab are progressing rapidly, guided by high-quality standards. Our goal is to create sustainable, future-ready infrastructure that elevates Punjab’s economic and technological landscape.”

These strategic projects form the foundation of CBD Punjab’s broader mission to redefine urban growth through innovation, sustainability, and transparency cementing its role as a transformative force in the province’s development ecosystem.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.