BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
Pakistan Print edition: 2025-12-28

CEO CBD Punjab visits project sites

Published Updated

LAHORE: The Punjab Central Business District Development Authority (PCBDDA), also known as Central Business District Punjab (CBD Punjab), continues its commitment to delivering world-class urban infrastructure with CEO CBD Punjab, Imran Amin, conducting a detailed visit to ongoing development projects across CBD Punjab and NSIT City.

During the visit, CEO CBD Punjab Imran Amin assessed progress and quality standards across multiple sites, including CBD VERTEX, CBD Walk, The Second Walk and CBD NSIT City.

Accompanying him were Executive Director Technical Riaz Hussain, Director Architecture & Planning Sameer Aftab Sial, Director Project Management Asif Iqbal, and senior representatives from NESPAK and contractors.

At CBD VERTEX scaffolding installation has been completed, paving the way for interior and exterior finishing works. The CBD Walk project has also made significant headway, with basement excavation and foundational concrete works concluded. The first slab construction is now in progress, reflecting efficient execution.

At CBD NSIT City, CEO CBD Punjab Imran Amin chaired a high-level review meeting and was briefed on ongoing infrastructure works and the Celestia IT & Office Tower project. Asphalt work on the internal road network is underway, while the top slab of the twelfth floor of the tower is nearing completion. Speaking on the occasion, CEO CBD Punjab Imran Amin stated, “All development initiatives under CBD Punjab are progressing rapidly, guided by high-quality standards. Our goal is to create sustainable, future-ready infrastructure that elevates Punjab’s economic and technological landscape.”

These strategic projects form the foundation of CBD Punjab’s broader mission to redefine urban growth through innovation, sustainability, and transparency cementing its role as a transformative force in the province’s development ecosystem.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.