BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

KARACHI: Mayor Karachi, Barrister Murtaza Wahab, on Friday held a meeting with industrialists in the SITE Area, Haroonabad, and briefed them on the ongoing sewerage treatment and water recycling projects aimed at industrial use.

On the occasion, the Chief Executive Officer of the Karachi Water & Sewerage Corporation, Ahmed Ali Siddiqui, briefed the Mayor and the industrialists on the technical aspects and the current status of the treatment plants.

The Mayor, accompanied by a delegation of industrialists, conducted a detailed visit to the SITE Limited Sewerage Treatment Plant.

During the visit, he stated that, for the first time in Karachi’s history, a formal process of treating wastewater and recycling it for industrial purposes is being initiated, with the objective of providing industries with a reliable, sustainable, and uninterrupted water supply.

Mayor Wahab informed that the TP-III treatment facility in Mauripur has become operational again after a long time. Similarly, after twenty-five years, complete cleaning and rehabilitation work has been carried out at the TP-I treatment plant in Haroonabad, while construction at the TP-I plant located behind the SITE Industrial Area is progressing rapidly.

The deadline for the completion of the first phase of the project has been set for December 31. In the initial phase, 20 MGD of water will be treated at the secondary level, while one million gallons of water per day will be recycled for industrial use.

A key objective of this project is to prevent untreated wastewater from flowing into the sea, thereby protecting marine life and the environment. International standards and SDGs have been kept in view while planning and executing this initiative.

He said that industries in Karachi require approximately 150 MGD of water daily, and this project will help meet at least 150 million gallons of this industrial demand.

He expressed hope that, if the recycled water system runs successfully, Karachi will earn the distinction of establishing Pakistan’s first “Industrial Water Park.”

The Pakistan Peoples Party government is taking serious and result-oriented measures to ensure a sustainable, safe, and quality-controlled water supply to the city’s industries. This project, he emphasized, will play a vital role in Karachi’s industrial growth and long-term economic stability.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.