BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
Print Print edition: 2025-11-16

40.8MW Koto hydropower project in Lower Dir inaugurated

  • The project generates 207 million units of electricity annually and brings in about Rs 2.4 billion in yearly revenue
Published Updated

PESHAWAR: Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi inaugurated the newly-constructed 40.8 MW Koto hydropower project in District Lower Dir on Saturday.

The completed at a total cost of Rs 21.7 billion and estimated to generate 207 million units of electricity annually, and earn an estimated revenue of Rs 2.4 billion per annum.

The chief minister also inaugurated the 18.5 kms Tormang-Razgram Road, constructed at a cost of Rs 1.5 billion.

Addressing the inaugural ceremony, Chief Minister Muhammad Sohail Afridi said the provincial government is working under a long term strategy to transform the province’s hydropower resources into a foundation for economic growth.

He said that clean and green energy projects will play a pivotal role in job creation alongside industrial development.

IGCEP 2025-35: Kohala terms project exclusion violation of CCI decision

He further said that establishment of province’s first ever power transmission line of 120 kms is also in pipeline and once completed, it will enable the transmission of electricity generated from 11 local power stations to industries. The power produced by local hydropower plants, he added, will be supplied to industries at concessional rates, as industrial expansion is essential for reducing unemployment.

The Chief Minister further stated that the provincial government will extend full support for establishing its own power distribution system. “The people of this province have the first right over its natural resources,” he said.

He expressed regret that foreign engineers working on development projects in Khyber Pakhtunkhwa are unable to visit the province due to delays in issuance of NOCs, adding that delays in completion of projects are causing loss not only to the province but entire nation.

Speaking about former prime minister Imran Khan, he said “Imran Khan has always had genuine concern for the people. I feel proud when I see the projects he initiated, because they were truly designed for the welfare and development of ordinary citizens. He launched long-term, transformative initiatives without worrying about who would inaugurate them later.” The Chief Minister reiterated that the federal government owes Khyber Pakhtunkhwa Rs 3 trillion, pending for several years.

The chief minister reiterated that these funds are necessary for development of the province.

PTI provincial president Junaid Akbar and elected representatives from Dir Lower also attended the ceremony.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.