BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)

ISLAMABAD: Chairman of the Capital Development Authority (CDA) and Chief Commissioner of Islamabad, Muhammad Ali Randhawa, on Tuesday reaffirmed that the under-construction T-Chowk Flyover will offer signal-free travel for commuters of Islamabad, Rawalpindi, and travellers from Lahore and Punjab, marking a major milestone in easing traffic congestion at one of the busiest entry points to the capital.

During a detailed visit to the project site, Randhawa reviewed the ongoing 24/7 construction activities and was briefed by the Project Director, consultants, and engineers. Accompanied by Member Engineering Nafasat Raza and Member Planning and Design Dr Khalid Hafeez, the chairman closely inspected the pace and quality of work.

Officials informed the Chairman that 12 piles of the flyover have been completed, with work on the 13th pile underway. Additionally, girder casting has commenced, and simultaneous development is ongoing across multiple sections of the site.

A critical component of the project — the relocation of utility services — is also being expedited. Randhawa instructed that this process be completed safely and at the earliest, to avoid any delays.

Emphasizing the need for strict adherence to deadlines and quality standards, the Chairman directed all consultants and engineers to maintain high-level execution and ensure timely completion. He added that the T-Chowk Flyover will not only ease local traffic congestion but also benefit intercity travellers, solidifying its role as a key infrastructure upgrade for the region.

“This project is not just a road — it’s a solution to years of traffic bottlenecks. We must remove all obstacles and keep construction moving round-the-clock,” Randhawa said during the visit.

The flyover, once completed, is expected to significantly reduce travel time and improve traffic flow between Islamabad and Rawalpindi, enhancing connectivity for thousands of daily commuters.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.