BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

ISLAMABAD: Power Division has issued a report on progress in power restoration in flood-affected areas. According to the report released by the Power Division, in the Peshawar Electric Supply Company (PESCO) region, 12 grids and 91 feeders were affected in Swat, Buner, Shangla, Swabi, and D I Khan, according to the Power Division report.

Out of these, 79 feeders have been fully restored and 12 partially restored, says the Power Division report.

In Gujranwala Electric Power Company (GEPCO)-managed areas — Sialkot, Narowal, Wazirabad, and Hafizabad — 10 grids and 86 feeders were affected. GEPCO has fully restored 62 feeders and partially restored 19, the report states.

In LESCO’s region, 46 affected feeders in Lahore, Kasur, and Okara have been partially restored. Full restoration is expected between August 31 and September 1, 2025.

In Faisalabad Electric Supply Company’s (FESCO) managed areas — Chiniot, Jhang, Sargodha, Mianwali, and D I Khan — 15 grids and 43 affected feeders have been temporarily restored.

In Multan Electric Power Company’s (MEPCO) service areas, 11 grids and 63 feeders were affected. The report added that as soon as floodwaters recede in MEPCO's region, restoration of the affected feeders will begin immediately.

In TESCO’s region, two affected feeders in North Waziristan have been temporarily restored, with full restoration expected by September 5, according to the Power Division.

Power Division maintained that field teams of Discos are working day and night on restoration efforts and assures that power supply in the affected areas will be fully restored as soon as possible.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.