BR100 Increased By (1.42%)
BR30 Increased By (1.24%)
KSE100 Increased By (1.02%)
KSE30 Increased By (1.18%)
AGHA 8.06 Increased By ▲ 0.05 (0.62%)
BECO 5.27 Increased By ▲ 0.09 (1.74%)
BML 59.31 Decreased By ▼ -1.61 (-2.64%)
BOP 33.78 Increased By ▲ 0.73 (2.21%)
CNERGY 9.60 Decreased By ▼ -0.08 (-0.83%)
CSIL 5.43 Increased By ▲ 0.04 (0.74%)
FCCL 51.84 Increased By ▲ 0.93 (1.83%)
FFL 16.66 Increased By ▲ 0.10 (0.6%)
FNEL 1.22 Increased By ▲ 0.02 (1.67%)
KEL 7.44 Decreased By ▼ -0.08 (-1.06%)
KOSM 5.58 Increased By ▲ 0.11 (2.01%)
LOTCHEM 30.58 Increased By ▲ 0.24 (0.79%)
MLCF 95.78 Increased By ▲ 2.46 (2.64%)
NBP 205.30 Increased By ▲ 9.47 (4.84%)
NCPL 55.11 Increased By ▲ 1.29 (2.4%)
NPL 64.80 Increased By ▲ 1.87 (2.97%)
OGDC 320.70 Increased By ▲ 1.20 (0.38%)
PACE 10.54 Increased By ▲ 0.13 (1.25%)
PAEL 41.40 Increased By ▲ 0.34 (0.83%)
PIBTL 16.70 Increased By ▲ 0.25 (1.52%)
PPL 223.49 Increased By ▲ 0.91 (0.41%)
PRL 41.55 Decreased By ▼ -0.50 (-1.19%)
PTC 68.20 Increased By ▲ 1.09 (1.62%)
SSGC 28.50 Increased By ▲ 0.12 (0.42%)
TBL 10.01 Increased By ▲ 0.18 (1.83%)
TELE 8.71 Increased By ▲ 0.08 (0.93%)
TPL 16.60 Increased By ▲ 0.95 (6.07%)
TPLP 12.13 Increased By ▲ 1.10 (9.97%)
TREET 22.85 No Change ▼ 0.00 (0%)
TRG 57.70 Decreased By ▼ -1.11 (-1.89%)

ISLAMABAD: Chashma Nuclear Power Plant Unit-1 (C-1) has achieved the milestone of continuous operation for 400 days for the first time in the history of Pakistan.

Earlier, Chashma Nuclear Power Plant (NPP) Unit-2 (C-2) and C-4 had made the record continuous run for 365 days.

Pakistan Atomic Energy Commission (PAEC) is currently operating six nuclear power plants in the country, providing 3530 MWs of electricity to the national grid. Four of these plants are at Chashma, near Mianwali whereas two named K-2 and K-3 are sited near Karachi.

The achievement of C-1 NPP is due to the acumen and hard work of PAEC teams of scientists, engineers and technicians. Currently, Chashma Nuclear Power Plants (C-1 to C-4) are running with high capacity and availability factors. Member Power, PAEC, has congratulated his team at Chashma Nuclear Power Generation Station (CNPGS) for the achievement, ensuring all safety parameters.

The stability of the national grid maintained by National Transmission and Despatch Company (NTDC) has also played a pivotal role in continuous operation of the NPP for which the company deserves felicitations.

PAEC is striving to achieve the United Nation’s Sustainable Development Goals (SDGs) especially SDG-7 (Ensuring access to affordable, reliable, sustainable and modern energy for all).

PAEC has been maintaining an enviable operational experience since Karachi Nuclear Power Plant (KANUPP) was connected to the national grid in 1972?

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.