BML 5.01 Decreased By ▼ -0.05 (-0.99%)
BOP 13.08 Increased By ▲ 0.08 (0.62%)
CNERGY 7.12 No Change ▼ 0.00 (0%)
CPHL 87.45 Increased By ▲ 1.38 (1.6%)
DCL 14.34 Decreased By ▼ -0.33 (-2.25%)
DGKC 170.76 Increased By ▲ 1.95 (1.16%)
FCCL 46.76 Increased By ▲ 0.59 (1.28%)
FFL 15.82 Decreased By ▼ -0.10 (-0.63%)
GCIL 26.87 Decreased By ▼ -0.39 (-1.43%)
HUBC 144.18 Increased By ▲ 2.27 (1.6%)
KEL 5.07 Decreased By ▼ -0.05 (-0.98%)
KOSM 6.69 Decreased By ▼ -0.20 (-2.9%)
LOTCHEM 20.59 Decreased By ▼ -0.41 (-1.95%)
MLCF 84.73 Increased By ▲ 0.66 (0.79%)
NBP 121.82 Decreased By ▼ -0.56 (-0.46%)
PAEL 43.46 Increased By ▲ 1.28 (3.03%)
PIAHCLA 22.29 Increased By ▲ 0.33 (1.5%)
PIBTL 8.93 Decreased By ▼ -0.06 (-0.67%)
POWER 14.01 Decreased By ▼ -0.08 (-0.57%)
PPL 169.94 Decreased By ▼ -0.01 (-0.01%)
PREMA 43.39 Decreased By ▼ -0.38 (-0.87%)
PRL 33.11 Increased By ▲ 0.24 (0.73%)
PTC 24.26 Decreased By ▼ -0.33 (-1.34%)
SNGP 119.64 Increased By ▲ 0.34 (0.28%)
SSGC 45.55 Increased By ▲ 0.38 (0.84%)
TELE 8.08 Decreased By ▼ -0.09 (-1.1%)
TPLP 10.47 Increased By ▲ 0.14 (1.36%)
TREET 23.97 Decreased By ▼ -0.18 (-0.75%)
TRG 58.05 Decreased By ▼ -0.80 (-1.36%)
WTL 1.52 Decreased By ▼ -0.03 (-1.94%)
BR100 13,631 Increased By 52 (0.38%)
BR30 39,851 Increased By 184.3 (0.46%)
KSE100 134,300 Increased By 517.4 (0.39%)
KSE30 40,814 Increased By 132.5 (0.33%)

LAHORE: The Lahore Electric Supply Company (LESCO) has successfully completed its March maintenance work aimed at improving the power transmission system and providing better services to consumers.

The maintenance work, carried out under the supervision of Chief Engineer O&M (T&G), included a range of activities designed to enhance the reliability and efficiency of the power grid.

According to details, LESCO has energized two 11kV feeders to ensure reliable power supply to consumers. The utility has replaced 36 11kV capacitor cells to improve power quality and reduce losses. Also, LESCO has installed bi-directional meters on outgoing feeders to accurately measure energy consumption.

Furthermore, the utility has replaced isolators and bus couplers to ensure system reliability and prevent faults. Besides, LESCO has replaced over current relays to enhance system protection and prevent damage to equipment. The utility has attended to thermo-vision hotspots to prevent equipment damage and ensure system reliability.

It has also upgraded power cables to improve system efficiency and reduce losses. The utility has also conducted safety seminars and fire fighting rehearsals to prioritize employee safety.

LESCO Chief Executive Officer Engineer Ramzan Butt reaffirmed the company’s commitment to eliminating system bottlenecks and ensuring uninterrupted power supply to consumers. “LESCO is dedicated to providing reliable electricity to the people, and we will continue to work tirelessly to achieve this goal,” he said.

Copyright Business Recorder, 2025

Comments

Comments are closed.