BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

ISLAMABAD: Work on the Mass Transit Master Plan 2030 is set to commence, with the Asian Development Bank (ADB) providing technical assistance in its preparation.

The plan aims to expand Islamabad’s transport network, including the extension of the Bus Rapid Transit (BRT) system, the introduction of rail cars, and increased investment in transport infrastructure.

This was discussed during a Zoom meeting between Capital Development Authority (CDA) Chairman Muhammad Ali Randhawa and an ADB delegation on Wednesday. The meeting was attended by Member Planning Dr Khalid Hafeez, DG Resources Shakeel Ahmed, and other senior CDA officials.

During the briefing, the CDA chairman was also updated on the Islamabad Intercity Bus Terminal project, for which the pre-feasibility report has been completed and a detailed feasibility study is now underway. The project will be integrated with the BRT and electric buses, featuring dedicated charging infrastructure.

Randhawa directed that the Intercity Bus Terminal be completed in phases as soon as possible. He emphasised that the ADB should develop the best operational and financial model for the project, ensuring alignment with government approvals and technical consultations.

The ADB representatives commended CDA’s efforts and assured full cooperation in Islamabad’s transport and infrastructure development.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.