BR100 Increased By (0.18%)
BR30 Decreased By (-0.03%)
KSE100 Increased By (0.16%)
KSE30 Increased By (0.26%)
BECO 5.58 Decreased By ▼ -0.07 (-1.24%)
BML 61.22 Decreased By ▼ -2.66 (-4.16%)
BOP 33.68 Increased By ▲ 0.01 (0.03%)
CNERGY 8.08 Decreased By ▼ -0.06 (-0.74%)
DCL 11.64 Increased By ▲ 0.26 (2.28%)
FCCL 52.14 Decreased By ▼ -0.13 (-0.25%)
FCSC 5.63 Increased By ▲ 0.13 (2.36%)
FFL 18.01 Increased By ▲ 0.29 (1.64%)
FNEL 1.35 Increased By ▲ 0.04 (3.05%)
HUMNL 11.04 Decreased By ▼ -0.14 (-1.25%)
KEL 7.84 Decreased By ▼ -0.02 (-0.25%)
KOSM 5.73 Increased By ▲ 0.09 (1.6%)
MLCF 86.51 Increased By ▲ 0.91 (1.06%)
NBP 184.30 Increased By ▲ 0.68 (0.37%)
PACE 11.65 Decreased By ▼ -0.03 (-0.26%)
PAEL 39.96 Decreased By ▼ -0.31 (-0.77%)
PIAHCLA 25.67 Decreased By ▼ -0.13 (-0.5%)
PIBTL 17.27 Increased By ▲ 0.23 (1.35%)
PPL 222.67 Decreased By ▼ -1.39 (-0.62%)
PRL 34.46 Decreased By ▼ -0.16 (-0.46%)
PTC 63.74 Decreased By ▼ -0.25 (-0.39%)
SEARL 90.46 Increased By ▲ 0.37 (0.41%)
SSGC 26.67 Increased By ▲ 0.07 (0.26%)
TELE 8.91 Decreased By ▼ -0.17 (-1.87%)
THCCL 68.47 Increased By ▲ 1.11 (1.65%)
TPLP 11.20 Decreased By ▼ -0.22 (-1.93%)
TREET 24.70 Decreased By ▼ -0.01 (-0.04%)
TRG 70.59 Decreased By ▼ -0.39 (-0.55%)
WAVES 11.11 Increased By ▲ 0.13 (1.18%)
WTL 1.27 Increased By ▲ 0.01 (0.79%)

ISLAMABAD: Prime Minister Shehbaz Sharif was all praise on Tuesday for the authorities concerned for completing the construction of Jinnah Square within a short span of 72 days, saying the project is a clear example of effective planning and teamwork.

The prime minister, during the inauguration of the flyover, termed the project as a remarkable achievement, highlighting its features, which consist of three underpasses, 10 lanes and the expansion of 14 kilometres of roadways.

He expressed hope about the construction of the newly built flyover, saying it would greatly improve the flow of traffic and the overall movement of vehicles in the federal capital.

“The newly inaugurated Jinnah Square is expected to facilitate smoother movement for the public and help reduce pollution by alleviating traffic congestion,” he added.

Sharif commended Interior Minister Mohsin Naqvi and the Capital Development Authority (CDA) team led by Muhammad Ali Randhawa for their swift execution of the project, despite the common tendency of bureaucrats and political leaders to delay development projects.

“It’s a moment of celebration for all of us, as such initiatives have the potential to transform the destiny of nations,” said Sharif.

The prime minister said: “The speed of Punjab has now been transformed into Mohsin speed.”

The prime minister expressed optimism that Naqvi would bring the same level of efficiency to other development projects throughout Islamabad.

In response, the minister pledged to intensify efforts to further enhance the “Mohsin Speed.”

PM Sharif ordered swift completion of the capital’s beautification projects.

Earlier, the prime minister was informed that Jinnah Square was completed in just 72 days, significantly shorter than the planned 120 days, and at a reduced cost of Rs4.2 billion.

Jinnah Square features three underpasses along the Srinagar Highway, connecting Zero Point to Murree (939 meters), Murree to Zero Point (939 meters), and from the Suharwardy Road Convention Centre to Aabpara (835 meters).

Additionally, the existing roads were widened over a length of 14 kilometres to alleviate traffic congestion at Serena Chowk and the Convention Centre.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.