BR100 Increased By (0.2%)
BR30 Increased By (0.41%)
KSE100 Increased By (0.07%)
KSE30 Increased By (0.23%)
AGHA 7.75 Decreased By ▼ -0.17 (-2.15%)
BECO 5.19 Decreased By ▼ -0.01 (-0.19%)
BML 58.66 Decreased By ▼ -0.59 (-1%)
BOP 33.69 Increased By ▲ 0.01 (0.03%)
CNERGY 10.61 Increased By ▲ 0.80 (8.15%)
CSIL 5.30 Decreased By ▼ -0.12 (-2.21%)
FCCL 53.74 Increased By ▲ 0.22 (0.41%)
FFL 16.46 Decreased By ▼ -0.22 (-1.32%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 7.28 Decreased By ▼ -0.07 (-0.95%)
KOSM 5.64 Increased By ▲ 0.03 (0.53%)
LOTCHEM 29.65 Increased By ▲ 0.54 (1.86%)
MLCF 96.36 Increased By ▲ 0.86 (0.9%)
NBP 203.53 Decreased By ▼ -0.82 (-0.4%)
NCPL 56.85 Decreased By ▼ -1.39 (-2.39%)
NPL 67.31 Decreased By ▼ -0.48 (-0.71%)
OGDC 318.22 Increased By ▲ 0.28 (0.09%)
PACE 10.63 Decreased By ▼ -0.08 (-0.75%)
PAEL 41.77 Decreased By ▼ -0.06 (-0.14%)
PIBTL 16.81 Increased By ▲ 0.31 (1.88%)
PPL 220.17 Increased By ▲ 0.43 (0.2%)
PRL 49.05 Increased By ▲ 4.46 (10%)
PTC 70.01 Decreased By ▼ -0.76 (-1.07%)
SSGC 29.14 Increased By ▲ 0.21 (0.73%)
TBL 9.77 Decreased By ▼ -0.07 (-0.71%)
TELE 8.82 Increased By ▲ 0.06 (0.68%)
TPL 17.17 Increased By ▲ 0.72 (4.38%)
TPLP 12.51 Increased By ▲ 0.41 (3.39%)
TREET 22.59 Decreased By ▼ -0.21 (-0.92%)
TRG 60.22 Increased By ▲ 0.19 (0.32%)

K-Electric (KE) has said that 71% of KE’s service territory remains loadshed exempt, adding that the remaining experience loadshedding in proportion to the “loss profile determined on the basis of recoveries on account of electricity bills payment and power theft”.

In a statement, KE spokesperson said the maximum duration of loadshedding is capped at 10 hours.

“Power theft bypasses safety protocols of electricity infrastructure installed by professionals and can lead to faults, which should not be equated with loadshedding.”

The statement by the KE comes after last week Jamaat-e-Islami (JI) Karachi interim Ameer Munim Zafar demanded immediate relief for Karachiites against the power crisis and accountability for the K-Electric.

He demanded forensic audit of the KE accounts and presented an eye opening comparison between the performances of the same entity before and after its privatisation.

He recalled that the then KESC was privatised in order to minimise the load-shedding and losses and subsidiaries and to enhance power production and maintain supply.

For the past 18 years of privatisation, the KE has decreased its production from 9304 million units to 7334 million units – showing a whopping decline of 19 percent instead of posting any increase, he said.

Comments

Comments are closed for this article.