BR100 Increased By (1.9%)
BR30 Increased By (1.3%)
KSE100 Increased By (1.66%)
KSE30 Increased By (1.87%)
AGHA 7.46 Increased By ▲ 0.01 (0.13%)
BECO 5.27 Increased By ▲ 0.03 (0.57%)
BML 57.26 Increased By ▲ 0.52 (0.92%)
BOP 34.75 Increased By ▲ 1.05 (3.12%)
CNERGY 11.06 Increased By ▲ 0.05 (0.45%)
CSIL 5.83 Decreased By ▼ -0.03 (-0.51%)
FCCL 56.42 Increased By ▲ 1.28 (2.32%)
FFL 16.41 Increased By ▲ 0.31 (1.93%)
FNEL 1.20 No Change ▼ 0.00 (0%)
KEL 7.32 Increased By ▲ 0.06 (0.83%)
KOSM 6.15 Increased By ▲ 0.14 (2.33%)
LOTCHEM 27.12 Increased By ▲ 0.21 (0.78%)
MLCF 97.94 Increased By ▲ 2.01 (2.1%)
NBP 206.88 Increased By ▲ 3.60 (1.77%)
NCPL 56.42 Increased By ▲ 0.69 (1.24%)
NPL 65.77 Increased By ▲ 0.72 (1.11%)
OGDC 316.30 Increased By ▲ 2.19 (0.7%)
PACE 10.87 Increased By ▲ 0.38 (3.62%)
PAEL 42.30 Increased By ▲ 0.38 (0.91%)
PIBTL 16.78 Increased By ▲ 0.04 (0.24%)
PPL 220.69 Increased By ▲ 2.97 (1.36%)
PRL 63.65 Increased By ▲ 0.95 (1.52%)
PTC 71.82 Increased By ▲ 0.36 (0.5%)
SSGC 27.08 Increased By ▲ 0.34 (1.27%)
TBL 9.72 Increased By ▲ 0.06 (0.62%)
TELE 8.73 Increased By ▲ 0.25 (2.95%)
TPL 19.40 Decreased By ▼ -0.58 (-2.9%)
TPLP 14.78 Decreased By ▼ -0.16 (-1.07%)
TREET 23.40 Increased By ▲ 0.33 (1.43%)
TRG 61.41 Increased By ▲ 0.74 (1.22%)

LAHORE: The newly constructed Jamia Mosque was inaugurated Sunday in Komila City of Upper Kohistan District in Khyber Pakhtunkhwa Province. The Jamia Mosque has been constructed by WAPDA at a cost of Rs 203.66 million under ‘Local Area Development Programme’ of Dasu Hydropower Project.

The scope of work included dismantling of the old structure and construction of a new building. A Madrasah, adjacent to the mosque, has also been constructed for imparting Islamic education in the area. Construction of the mosque commenced in August 2021.

Having a mesmerising view, the Mosque is located in the heart of Komila City.

It is pertinent to mention that WAPDA is spending Rs.17.35 billion for socio-economic uplift of the locals in Dasu Hydropower Project area. These schemes relate to resettlement, social development and environment management. Dasu Hydropower Project is being constructed across River Indus upstream of Dasu Town in Upper Kohistan District of Khyber Pakhtunkhwa Province. Electricity generation from the Project is scheduled in 2026.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.